  • Time to obtain permit after damage12 months

    After a structure has been damaged to over fifty (50) percent of its value, the owner shall have twelve (12) months after the date of the damage to obtain a building permit for reconstruction.

  • Such use may be continued so long as it is not discontinued for more than two years.

  • Parking lot modification limit75 pct

    Any other modification to the parking lot, not exceeding 75% of the paved area of the parking lot.

  • Reconstruction start time180 days

    Reconstruction is started within one hundred eighty (180) days from the date of the damage.

  • Restoration cost threshold50 pct

    If a nonconforming structure is destroyed or damaged, and the cost of restoring the structure to its condition does not exceed fifty (50) percent of current assessed value, then the structure may be restored.

  • Sign repair damage threshold50 pct

    A nonconforming sign may be repaired provided it has not been damaged in excess of fifty percent of its replacement value.