Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Damage restoration threshold50 pct
cost of restoring the structure to its condition does not exceed fifty (50) percent of current assessed value
- Natural disaster repair deadline2 years
Unless such building is repaired or rebuilt within two (2) years of the date of the natural disaster...
- No increase in nonconformity
No nonconforming structure may be altered in a way which increases the nonconformity.
- Restoration start deadline180 days
reconstruction is started within one hundred eighty (180) days from the date of the damage
- Enlargement within plane for yardYardThe open space left between a building and its lot line — the space a setback creates. encroachment
a principal structure which is nonconforming due to encroachment into a required yard may be enlarged within or coextensive with the plane of the structure
From the ordinance
No nonconforming structure may be altered in a way which increases the nonconformity. However, a principal structure which is nonconforming due to encroachment into a required yard may be enlarged within or coextensive with the plane of the structure... if a nonconforming structure is destroyed or damaged, and the cost of restoring the structure to its condition does not exceed fifty (50) percent of current assessed value... then the structure may be restored...