Section 11
Dimensional standards
Extracted standards
11 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Density
- Commercial footprint limit10,000 sqft_per_acre
Commercial/Retail structures shall be no more than 10,000 square foot per acre footprint per remaining developable acreage.
- Light industrial footprint limit20,000 sqft_per_acre
Light Industrial structures shall be no more than a 20,000 square foot per acre footprint per remaining developable acreage.
- Minimum acreage same as underlying districtZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2.
Minimum acreage for a PUD shall be the same as the minimum lot acreage for the zoning district that the PUD will be located in
Environmental
- Avoid hazardous areas
Avoid development in hazardous, geologically sensitive, wetland or riparian areas
Other
A minimum of 50% of the PUD acreage shall perpetually remain in open space limited by deed restriction.
- Final plan hearing deadline90 days
The BOCC shall hold a public hearing within ninety (90) days of the complete application for Final Plan approval
- Landscaping, buffering, screening
Be landscaped, buffered, and screened with native plants and trees
- Preliminary plan submittal deadline180 days
Upon approval of the Preliminary Plan, the Developer shall have one hundred and eighty (180) days to submit all data for the final Plan phase
- Adequate water and sewer required
Have adequate water and sewer
- Wildlife mitigation
Mitigate adverse impacts on wildlife
Wildfire
- Wildfire mitigation
Minimize potential fire hazards
From the ordinance
A minimum of 50% of the PUD acreage shall perpetually remain in open space limited by deed restriction.