Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Tower heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. limits
For a single user: up to 90 feet in height. For two users: up to 120 feet in height. For three or more users: up to 150 feet in height.
- Tower removal
Towers which are not used for a period of six months or more shall be removed by the owner within 90 days. Towers which are not maintained for a period of six months or more shall be removed by the owner within 90 days.
The minimum lot depth (setback) for any lot from the base of the tower to any property line adjacent to any residential district from any dwelling on any lot used for dwelling purposes other than a lot in any residential district shall be equal to 120% of the proposed tower height. The minimum lot depth from other property lines shall be 50 feet unless a greater setback is required as a condition of approval due to circumstances adversely affecting the public health, safety or welfare.
From the ordinance
Communication towers shall be permitted in General Business (B-2), Light Industrial (M-1), and Heavy Industrial (M-2) following a public hearing and approval as set forth in Articles XVI and XVIII.