Dimensional standards
Density
- Maximum units
- 1
Uses
Permitted by right1
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum extension90 days
One extension not exceeding 90 days may be granted by the administrator
- Maximum temporary homes per parcel1 unit
Only one temporary manufactured home is allowed per parcel.
- Permit expiration for new construction730 days
All permits issued for temporary residence while constructing a new replacement residence shall expire within two years after the date of issuance.
- Permit expiration for repair365 days
All permits for temporary residences, while repairing a permanent residence shall expire within one year after the date of issuance.
- Removal after certificate of occupancy30 days
All temporary manufactured homes must be removed at least 30 days after a final certificate of occupancy has been issued.
From the ordinance
A manufactured home, Class B may be allowed as a temporary residence during the construction, repair, or renovation of a permanent residential structure on a single lot or parcel subject to the following: