Claremont, Virginia · General provision

Sec. 4-805

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • The excavations shall be confined to areas distant at least 50 feet from all adjoining property lines, at least 100 feet from any and all adjoining property lines in any R-1 or R-2 Residence or Business District, and distant at least 200 feet from any dwelling or any and all property lines in any platted subdivision except that excavations may be conducted within such limits provided the written consent of the owners of such adjoining properties are secured.

  • The excavations shall be confined to areas distant at least 200 feet from the right-of-way lines of any existing or platted street, road or highway, except that where the ground level is higher than the road the board may permit excavations down to the road level.

  • Mining machinery setbackSetbackThe distance a building must be held back from a lot line. from residential/business districts600 ft

    Any building containing power driven or power producing machinery or equipment shall be distant at least 600 feet from all adjacent property in any R-1 or R-2 Residence or Business District or the right-of-way lines of any existing or platted street, road or highway.

From the ordinance

The excavations shall be confined to areas distant at least 50 feet from all adjoining property lines...
Sec. 4-805