Height
Battery energy storage systems shall not exceed a height of 30 feet, except for structures associated with interconnection to the electrical grid.
Lighting
- BESS lighting motion-sensor only
Lighting of any battery energy storage system shall be limited to that minimally required for safety and operational purposes and all lighting shall be exclusively motion-sensor activated.
Noise
- BESS noise at property line65 dBA
The average noise generated from the battery energy storage systems, components, and associated ancillary equipment at any time shall not exceed a noise level of 65 dBA as measured from the property line of an adjoining parcel...
Other
- BESS bonding requirement
The board of supervisors may require a bond or letter of credit in an amount and with surety satisfactory to the department of planning...
- BESS decommissioning plan required
The applicant shall submit a decommissioning plan prior to site plan approval.
- BESS emergency response plan required
Prior to final site plan approval, an emergency response plan shall be developed in coordination with the Surry County Chief of Emergency Management and/or the fire marshal...
- BESS security fence heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.8 ft
Battery energy storage systems shall be enclosed by a security fence at least eight feet in height or other greater height as required by applicable codes or design requirements of the operating entity.
- BESS remediation responsibility
The battery energy storage system operator or owner shall be responsible for any environmental remediation required by the county or the state and the costs of such remediation.
- BESS transportation and traffic control plan required
Prior to site plan approval, the applicant or project owner shall prepare and submit such a plan to the Virginia Department of Transportation (VDOT) and the county for review and approval.
Signage
- BESS sign maximum area4 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
The sign shall not exceed four square feet in size and shall be located on the security fence or other approved location.
From the ordinance
Battery energy storage systems shall be enclosed by a security fence at least eight feet in height...