Claremont, Virginia · General provision

Sec. 3-1307 through 3-1310

Historic PreservationAll Claremont districts0

Extracted standards

8 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Appeal process

    Any person aggrieved by any decision of the historic architectural review committee may appeal such decision to the board of supervisors...

  • Application requirements

    Statement of proposed use and user, site plan drawings, architectural drawings, landscaping and buffer plan, designs for signage...

  • Approval required for new construction, alteration, renovation, and demolition

    An application shall be submitted to the administrator for review and action by the board of review...

  • Delay of approval for up to two years

    It may delay the effective date of an approval for a period of two years to enable negotiations...

  • Demolition requires board of supervisors approval

    No historic landmark, building or structure within a HP Historic District shall be razed or demolished until the razing or demolishment thereof is approved by the board of supervisors after public hearing...

  • The board of review shall hold a public hearing and shall take action within 100 days after receipt by the administrator.

  • Referral to Preservation Virginia

    At least 30 days prior to the public hearing, the administrator shall refer the application in writing to Preservation Virginia...

  • Review criteria for compatibility

    The age and character of the historic structure, its probable life expectancy, and the appropriateness of the proposed changes...

From the ordinance

No historic landmark, building or structure within a HP Historic District shall be razed or demolished until approved by the board of supervisors after public hearing...
Sec. 3-1307 through 3-1310