Front Royal, Virginia · General provision

175-109

Dimensional standards

Extracted standards

6 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Bond may be required

    The Zoning Administrator, in granting a temporary construction trailer permit, may require the posting of a bond to insure that the temporary construction trailer will be removed and the site left in good order at the expiration of the permit.

  • Maximum period6 months

    The maximum period allowable for the placement of a temporary construction trailer shall be six (6) months or until completion of the project, whichever is shorter.

  • A minimum area of two thousand (2,000) square feet shall be provided for each temporary construction trailer space.

  • Sanitary facilities conform to State Health Department

    All sanitary facilities must conform to State Health Department trailer camp sanitation requirements.

  • Zoning permit required

    Zoning permits for temporary trailers may be issued by the Zoning Administrator in any zoning district for construction purposes only.

Parking

From the ordinance

A minimum area of two thousand (2,000) square feet shall be provided for each temporary construction trailer space.
175-109