Dimensional standards
Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Bond may be required
The Zoning Administrator, in granting a temporary construction trailer permit, may require the posting of a bond to insure that the temporary construction trailer will be removed and the site left in good order at the expiration of the permit.
- Maximum period6 months
The maximum period allowable for the placement of a temporary construction trailer shall be six (6) months or until completion of the project, whichever is shorter.
- Minimum area per trailer2,000 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
A minimum area of two thousand (2,000) square feet shall be provided for each temporary construction trailer space.
- Sanitary facilities conform to State Health Department
All sanitary facilities must conform to State Health Department trailer camp sanitation requirements.
- Zoning permit required
Zoning permits for temporary trailers may be issued by the Zoning Administrator in any zoning district for construction purposes only.
Parking
- Minimum parkingMinimum parkingThe number of off-street spaces a development must provide before it may open. spaces per trailer2 spaces
Each temporary construction trailer shall have a minimum of two (2) off-street parking spaces in addition to other parking spaces required by this chapter for other activities.
From the ordinance
A minimum area of two thousand (2,000) square feet shall be provided for each temporary construction trailer space.