Essex County Unincorporated, Virginia · General provision
Section 36.423
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Permit duration12 months
A zoning permit is issued for a period of twelve (12) months only upon showing by the applicant of a valid and approved building permit
- Maximum renewal12 months
Such temporary permit may be renewed for a maximum of an additional twelve (12) months
Setback
- YardYardThe open space left between a building and its lot line — the space a setback creates. requirements
All yard requirements of the district for a principal structure in which the temporary building or construction trailer is located are met
Use
- Permitted in any districtZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2.
may be permitted in any district during the period construction work is in progress
From the ordinance
Temporary construction trailers and temporary buildings, used in conjunction with construction work only and not for residential occupancy, may be permitted in any district during the period construction work is in progress.