Section 36.400 (Broadcasting or communication tower)
Dimensional standards
Extracted standards
14 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Buffer yardYardThe open space left between a building and its lot line — the space a setback creates. required
A buffer yard shall be provided surrounding the facility.
- Collapse within lot required
Towers shall be designed to collapse fully within the lot lines of the subject property in case of structural failure.
- Collocation capacity required
All broadcasting or communication facilities shall be designed, structurally, electrically, and in other respects, to accommodate both the applicant's antennas and comparable antennas for at least three additional users, if the tower is over 100 feet in height, or for at least two additional users if the tower is over 60 feet in height.
- Fall zone required
No habitable structures or places where people gather shall be located within any 'fall zone' as certified by a registered professional engineer licensed in Virginia.
- Lighting restrictions
Towers shall be illuminated as required by the Federal Communications Commission, (FCC) but no lighting shall be incorporated if not required by the FCC, other than essential security lighting. Site lighting shall full cut-off and directed downward.
- Maximum extension beyond existing structure25 ft
Towers and equipment attached to existing structures shall not extend more than 25 feet beyond the existing structure and must be designed to be architecturally compatible.
- Maximum tower heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.125 ft
The maximum height of any Broadcasting and Communication Tower shall be made a condition of the conditional use permit. No facility shall be greater than 125 feet.
- Monopole design required
Broadcasting or communication towers shall be of a monopole design unless the Board of Supervisors determines that an alternative design would better blend into the surrounding environment.
- No outdoor storage
There shall be no outdoor storage associated with the facility.
- No tower between principal structure and public street
Towers shall not be located between the principal structure and a public street.
- Removal bond required
A bond, whose amount shall be approved by the Zoning Administrator shall be required to assure the removal of an abandoned telecommunications facility.
- Removal timeframe after cessation6 months
All towers and associated facilities shall be removed within six months of the cessation of operations at the site unless a time extension is approved by the Zoning Administrator.
- SetbackSetbackThe distance a building must be held back from a lot line. equal to tower heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.
Towers shall have a minimum front, side, and rear yard setback equal to the height of the tower.
- Signage limited
Signage on site shall be limited to no trespassing or safety signs to be positioned on the fence surrounding the facility.
From the ordinance