Dimensional standards
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Minimum corner lot widthLot widthHow wide a lot must be, usually measured at the front setback line. at setbackSetbackThe distance a building must be held back from a lot line. line for subdivisions platted after enactment120 ft
For subdivisions platted after the enactment of this chapter each corner lot shall have a minimum width at the setback line of 120 feet.
- Patio must be at least 5 feet from property line5 ft
A patio may be included as open space in meeting open space requirements and may be included as yard area in meeting yard dimension requirements, provided that no structure is closer than five feet to the property line.
- Satellite antennae prohibitedProhibitedNot allowed in the district at all, short of rezoning or a variance. in front yardYardThe open space left between a building and its lot line — the space a setback creates.
Satellite antennae shall not be permitted in the front yard of any lot. No portion of a satellite antenna will be closer than five feet to the side or rear lot line.
- Uncovered porch may project into front yardYardThe open space left between a building and its lot line — the space a setback creates.10 ft
An uncovered porch may project into a required front yard for a distance not exceeding 10 feet.
From the ordinance
An uncovered porch may project into a required front yard for a distance not exceeding 10 feet. Patio must be at least 5 feet from property line. Corner lots min width 120 ft at setback line. Satellite antennae not in front yard.