Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum active temporary use permits per lot1 permits
Only one temporary use permit can be active on a lot at any time, unless an event or activity is sponsored, managed or operated by a nonprofit organization, and in the judgment of the zoning administrator, adequate space exists for two temporary uses... no more than two events or activities can be active on the same lot at the same time.
- Minimum separation between events30 days
Each activity or event shall be separated by a period of not less than 30 consecutive days from the previous event on that lot
- Minimum setbackSetbackThe distance a building must be held back from a lot line. from public right-of-way20 ft
All temporary activities and any appurtenant structures, signs, goods and other features must be set back from any public right-of-way at least 20 feet.
- Nonprofit representative present
For any temporary activity sponsored, managed or operated by a nonprofit organization, a representative from the nonprofit organization shall be present at the activity at all times it is in operation.
From the ordinance
Each activity or event shall be separated by a period of not less than 30 consecutive days from the previous event on that lot... All temporary activities and any appurtenant structures, signs, goods and other features must be set back from any public right-of-way at least 20 feet.