Claremont, Virginia · General provision

Sec. 4-705

Dimensional standards

Extracted standards

5 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Initial permit duration5 years

    The special exception permit, if approved, shall initially be issued for a period not to exceed five years.

  • Maximum continuous occupancy120 days

    The maximum length of continuous occupancy in the same campground shall be no more than 120 days.

  • Renewal permit duration10 years

    Renewal of the permit shall be obtained prior to the expiration of the initial five years, after which a permit may be issued for period of not more than ten years.

  • Access road width10 ft

    Access to campsites shall be provided by a ten-foot all weather road suitable for volume and characteristics of the vehicles typical of a campground.

Setback

From the ordinance

Density permitted is one campsite per 0.5 acres. The maximum number of campsites shall be ten sites. No campsite shall be located within 200 feet of single-family residence located on an adjoining property, other than the residence of the owner/operator of the campground.
Sec. 4-705