Claremont, Virginia · General provision

Sec. 3-1301 to 3-1310

Dimensional standards

Extracted standards

6 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Procedure for approval

    Application to administrator, public hearing, referral to Preservation Virginia, action within 100 days.

  • No building shall be constructed or used and no land shall be used... unless approved by the board of historic and architectural review.

  • Delay of approval up to 2 years2 years

    The board may delay the effective date of an approval for a period of two years to enable negotiations for acquisition.

  • Razing or demolition requires board of supervisors approval

    No historic landmark, building or structure within a HP Historic District shall be razed or demolished until approved by the board of supervisors after public hearing.

  • Minor exemptions from board review

    Repainting same color, replacement of windows/doors with same materials, antennas not visible from street, planting grass/trees, outside storage not visible, interior changes.

  • Criteria for board consideration

    Public necessity, historic value, compatibility, view from public street, effect on trees, etc.

From the ordinance

The HP, Historic Preservation District shall be a special overlay district... No building shall be constructed or used... unless approved by the board of historic and architectural review.
Sec. 3-1301 to 3-1310