Extracted standards
8 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- As-built plans required
The town shall require as-built plans of public improvements, including geotechnical investigations.
- Contour interval for site plans2 ft
Topography of the project area with contour intervals of two feet or less, unless waived by the administrator.
- Preliminary site plan review time60 days
The administrator shall review the preliminary site plan and shall approve or disapprove the plan within 60 days of the filing of the plan.
- Resubmission review time30 days
The administrator shall review the resubmitted plan within 30 days of the filing of the plan.
- Uses requiring site plan review
Site plans required for: conditional use permit uses, cluster subdivisions, planned housing developments, mobile home parks, any other use except detached single-family dwellings and duplexes, and parking lots with more than ten spaces.
- Site plan scale50 ft per inch
Site plans shall be prepared to a scale of one inch equals 50 feet, or such other scale as may be approved by the administrator.
- Temporary site plan maximum duration1 year
A temporary site plan may be approved by the administrator for a proposed development or land use for a period not to exceed one year.
- Traffic impact statement thresholds
Traffic impact statement required when: 100 vehicle trips per peak hour by residential development, or 250 vehicle trips per peak hour by non-residential development, or 2,500 vehicle trips per day by non-residential development.
From the ordinance
Site plans for the following uses shall be submitted and reviewed... (1) Uses permitted by approval of a conditional use permit... (5) Any other use except detached single-family dwellings and duplexes. (6) Any parking lot or parking facility which is to contain more than ten spaces.