Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Certificate of occupancy display for commercial
Such certificate must be displayed by commercial establishments.
- Certificate of occupancy issuance time10 days
The permit shall be issued within ten days after the erection or structural alteration of such building or part has conformed with the provisions of this chapter.
- Scale drawing required with zoning permit application
Each application for a zoning permit may be required to be accompanied by at least one copy of a scale drawing.
- Zoning permit validity period180 days
Buildings or structures shall be started, reconstructed, enlarged or altered only after a zoning permit has been obtained from the administrator, and shall be void after a period of 180 days from the date of approval, if not utilized during the 180-day period.
From the ordinance
Buildings or structures shall be started... only after a zoning permit... void after 180 days... certificate of occupancy issued within ten days... displayed by commercial establishments.