Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Dumpster fence heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. requirement
The height of the fence shall be equal to or higher than the height of the dumpster, in accordance with section 32-91(g).
- Dumpster fence material
The visible material of the fence shall be made up of brick, stucco, stone, or wood.
- Dumpster fence required
A fence on three sides shall enclose all dumpsters.
- Dumpster gate requirement
The operable side of the dumpster shall be concealed with a gate equal to or higher than the height of the dumpster. The gate shall be opaque and constructed of durable materials.
- Dumpster setbackSetbackThe distance a building must be held back from a lot line. from property line5 ft
Dumpsters shall be located a minimum of five feet from property lines.
- Service hours near residential
Service activities within 150 feet of residential uses shall only be permitted Monday through Friday between 7:00 a.m. to 10:00 p.m. and on Saturdays from 9:00 a.m. to 9:00 p.m.
- Temporary construction dumpster allowed
Temporary construction trash and recycling dumpsters, which are not enclosed, shall be permitted up until such time as a certificate of occupancy is issued.
From the ordinance
A fence on three sides shall enclose all dumpsters.