Cape Charles, Virginia · General provision

Sec. 32-83

Planned Unit DevelopmentAll Cape Charles districts0

Dimensional standards

lot requirementsSTREETbuildable areaRear 10 ftSide 5 ftMin width 60 ftMIN LOT AREA5 acMAX HEIGHT40 ftMAX LOT COVERAGE60%MAX FAR0.35MIN OPEN SPACE10%
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Uses

Permitted by right1

  • All uses permitted by-right and as accessory uses in the R-3 District except short-term rentals and electric vehicle charging station(s)

Conditional / special use4

  • All uses in the C-1, C-2 and C-3 Districts
  • Conditional uses within the R-3 District
  • Short term rentals including subletting of units (less than 1,000 sq ft, 30 days or less)
  • Any other commercial or professional use compatible with the intent of the district

Extracted standards

14 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Density

Height

Other

Parking

  • Parking distance from dwelling200 ft

    No such parking lot or garage shall be located more than 200 feet from the dwelling unit which it serves.

Setback

From the ordinance

The following standards shall apply: Minimum of five acres (5 ac) for the PUD District. Townhouse projects must have minimum of one acre. Multi-family projects must have minimum of one acre.
Sec. 32-83

Parking requirements

{
  "townhouse": "2 spaces per dwelling unit",
  "multi_family_2plus_br": "2 spaces per unit",
  "multi_family_1br_studio": "1 space per unit"
}