Cape Charles, Virginia · General provision

Sec. 32-81

Planned Unit DevelopmentAll Cape Charles districts0

Dimensional standards

lot requirementsSTREETMIN LOT AREA5 acMAX IMPERVIOUS80%
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Uses

Permitted by right4

Conditional / special use1

  • Any use listed as a conditional use in the R-1, R-2, R-3, CR, C-1, C-2, C-3, and Harbor—Commercial

Accessory1

  • Accessory uses as permitted in the R-1, R-2, and R-3 districts

Extracted standards

11 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Density

  • Density flexibility

    The sub-areas of PUD districts may contain the density requirements of one or more of the R-1, R-2, and R-3 for residential districts, and CR, C-1, C-2, C-3, and HARB-C for the commercial districts.

Other

Setback

From the ordinance

The minimum contiguous area for PUD districts shall be five acres (5 ac). The maximum impervious surface coverage in PUD districts shall not exceed 80 percent of the total gross area of development.
Sec. 32-81