Article 10, Section 10.28.030
Extracted standards
14 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Bond amount
a bond with surety or condition acceptable to the Town in the amount of the estimated cost of the required physical improvements
- Maximum contour interval2 ft
Existing topography with a maximum of two foot contour intervals
- Maximum spot elevation spacing50 ft
spot elevations where necessary but not more than 50 feet apart
- Minimum driveway width22 ft
Construction of vehicular travel lanes or driveways not less than 22 feet in width
- Notification prior to street work3 days
The owner shall notify the Administrator, in writing, three days prior to the beginning of all street or storm sewer work
- Pedestrian walkways required
Designation of pedestrian walkways so that patrons may walk on the same from store to store or building to building within the site and to adjacent sites.
- Screening, fences, walls required
Screening, fences, walls, curbs, and gutters as are required by the provisions of this article
- Approval time60 days
action is taken by the approving authority on the site plan within 60 days
- Number of copies7 copies
Seven clearly legible blue or black-line copies of the site plan shall be submitted.
- Expiration1 years
Approval of a site plan submitted under the provisions of this article shall expire one year after the date of such approval
- Site plan scale50 ft per inch
Site plans shall be prepared to a scale of one inch equals 50 feet or larger.
- Site plan sheet size
the sheet or sheets shall be twenty-four by thirty-six (24 x 36) inches.
- Survey error of closure10,000 1 in
with an error of closure within the limit of one in 10,000
Signage
- No parking signs required
Adequate no parking signs along such streets, highways or driveways to prohibit parking on such as required by the Town Council.
From the ordinance
Every site plan submitted in accordance with this article shall contain the following information: ...