Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Signage
- Sign permit expiration period6 months
A zoning permit for a sign shall expire and become null and void if the approved sign is not completely erected within a period of six months from the date the permit was originally issued.
- Maximum sign permit extensions1 count
The zoning administrator may grant one extension for a period of six months.
From the ordinance
A zoning permit for a sign shall expire and become null and void if the approved sign is not completely erected within a period of six months from the date the permit was originally issued. The zoning administrator may grant one extension for a period of six months.