Bluefield, Virginia · General provision

Sec. 74-474 to 74-476

Extracted standards

13 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • The manufactured home complies with all applicable lot size, setbacks, and other requirements of the zoning district in which it is to be located.

  • Foundation per Virginia Uniform Statewide Building Code

    The manufactured home has a foundation of concrete or other material allowed by the Virginia Uniform Statewide Building Code for site-built homes which is aesthetically compatible with the manufactured home having the appearance of site-built construction.

  • Installation time limit90 days

    The owner of the manufactured home shall be granted 90 days to complete the installation upon the lot where the manufactured home is to be permanently located. At the discretion of the zoning administrator, an additional 90-day extension shall be granted providing the manufactured home owner can show justifiable cause for the extension.

  • Land ownership requirement

    Manufactured home owners or purchasers must own or be purchasing the land upon which their manufactured home is to be placed. The owner or purchaser shall record with the proper county authority a non-revocable option declaring the manufactured home as real property.

  • A manufactured home shall not be permanently located on any lot that already has an existing residence located on it.

  • Permit fee set by town

    The fee for the permit shall be regulated and set by the Town of Bluefield.

  • Permit valid until moved

    Each permit issued by the Town of Bluefield for a manufactured home shall be valid until the manufactured home is moved to another location whether on the same or different property.

  • Right-of-way improvements

    The manufactured home provides right-of-way improvements in the same manner as site-built construction, in accordance with town policy.

  • Siding materials acceptable for site-built housing

    The manufactured home has siding materials which are generally acceptable for site-built housing. Any siding materials may be used provided it has a tile appearance of wood, masonry, horizontal metal, or vinyl siding.

  • Site plan required

    A site plan shall be submitted to the town for approval showing: lot lines and lot size; proposed location of manufactured home on lot; location of existing structures on lot; proposed location of water and sewer lines and connections; and scale used and north arrow.

  • Siting permit required

    Prior to the location, relocation, establishment or occupancy of any manufactured home, the manufactured home owner or authorized representative shall obtain a siting permit from the town.

  • Temporary permit duration1 year

    A temporary use permit may be issued by the town for a period not to exceed one year. A temporary permit may be renewed for an additional six-month period by the town council upon a showing of good cause.

  • Applicants who are in the process of building a conventional dwelling may apply for a temporary permit, which shall be subject to renewal, to locate a nonconforming manufactured home temporarily on the building lot during the course of construction of the dwelling.

From the ordinance

The manufactured home has siding materials which are generally acceptable for site-built housing... Prior to the location, relocation, establishment or occupancy of any manufactured home, the manufactured home owner or authorized representative shall obtain a siting permit from the town.
Sec. 74-474 to 74-476