Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum temporary housing duration12 months
Use shall be limited to a period of 12 months or until reconstruction of the structure is complete or a permanent structural certificate of zoning compliance is issued, whichever is sooner.
- Temporary housing utility connection
The temporary housing unit must be on the same lot as the house being reconstructed and shall be connected to all public utilities.
- Temporary housing subject to yardYardThe open space left between a building and its lot line — the space a setback creates. restrictions
A temporary housing unit may be approved for location during the reconstruction of a permanent single-family home, damaged or destroyed due to natural or other disasters, subject to all yard restrictions.
From the ordinance
A temporary housing unit may be approved for location during the reconstruction of a permanent single-family home, damaged or destroyed due to natural or other disasters, subject to all yard restrictions.