Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Buffer yardYardThe open space left between a building and its lot line — the space a setback creates. location
The buffer yard shall be located entirely within the higher intensity zoning district and abutting the zoning district line, or adjacent right-of-way if such right-of-way separates the lot from the zoning district line.
- Maximum buffer yardYardThe open space left between a building and its lot line — the space a setback creates. slope
The maximum slope of any buffer yard shall be 2H:1V.
- Buffer yardYardThe open space left between a building and its lot line — the space a setback creates. required when abutting lower intensity districtZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2.
A buffer yard shall be required of any lot in any zoning district when the lot in that district abuts a zoning district of lower intensity.
From the ordinance
A buffer yard shall be required of any lot in any zoning district when the lot in that district abuts a zoning district of lower intensity. The maximum slope of any buffer yard shall be 2H:1V.