Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Floodplain
- FloodplainFloodplainLand expected to flood at a stated frequency, where building carries extra conditions. alteration allowed
In Downtown Commercial and General Commercial districts, the floodplain may be piped, channeled, or otherwise altered, so long as the applicant shows that the resulting 100-year flood elevation will not flood the proposed or existing buildings on site or adjacent sites.
From the ordinance
In Downtown Commercial and General Commercial districts, the floodplain may be piped, channeled, or otherwise altered, so long as the applicant shows that the resulting 100-year flood elevation will not flood the proposed or existing buildings on site or adjacent sites.