Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum restoration cost as percentage of assessed value50 pct
cost of restoring the structure to its condition does not exceed fifty (50) percent of current assessed value
- Reconstruction start deadline after damage180 days
reconstruction is started within one hundred eighty (180) days from the date of the damage
From the ordinance
No nonconforming structure may be altered in a way which increases the nonconformity. However, a principal structure which is nonconforming due to encroachment into a required yard may be enlarged within or coextensive with the plane of the structure, so long as no new nonconformity is thereby created. ... if a nonconforming structure is destroyed or damaged, and the cost of restoring the structure to its condition does not exceed fifty (50) percent of current assessed value of the entire structure, then the structure may be restored to its original nonconforming condition, provided that a building permit is secured, reconstruction is started within one hundred eighty (180) days from the date of the damage