Riverside, California · General provision

Chapter 19.570

Extracted standards

23 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Compost application rate4 cuyd/1000sqft

    Compost at a rate of a minimum of four cubic yards per 1,000 square feet of permeable area.

  • Minimum distribution uniformity for sprinkler heads0.65 ratio

    All sprinkler heads installed in the landscape must document a distribution uniformity low quarter of 0.65 or higher.

  • ETAF for existing landscapes0.8 factor

    The ETAF for existing, non-rehabilitated landscapes is 0.8.

  • Maximum evapotranspiration adjustment factor (nonresidential)0.45 factor

    The ETAF for the landscape project does not exceed a factor of 0.45 for nonresidential areas.

  • Maximum evapotranspiration adjustment factor (residential)0.55 factor

    The ETAF for the landscape project does not exceed a factor of 0.55 for residential areas.

  • Maximum ETAF for special landscape areas1 factor

    The ETAF for new and existing (non-rehabilitated) special landscape areas shall not exceed 1.0.

  • Flow sensors are required for all nonresidential landscapes and residential landscapes of 5,000 square feet or larger.

  • Graywater system compliance

    All graywater systems shall conform to the California Plumbing Code (Title 24, Part 5, Chapter 16) and any applicable local ordinance standards.

  • High water use plants in street medians

    High water use plants, characterized by a plant factor of 0.7 to 1.0, are prohibited in street medians.

  • Irrigation efficiency for drip systems0.81 ratio

    The irrigation efficiency for purposes of this chapter is 0.81 for drip systems.

  • Irrigation efficiency for overhead spray0.75 ratio

    The irrigation efficiency for purposes of this chapter is 0.75 for overhead spray devices.

  • Irrigation scheduling window

    Overhead irrigation shall be scheduled between 8:00 p.m. and 10:00 a.m.

  • Maximum irrigation application rate on slopes >25%0.75 in/hr

    Slopes greater than 25 percent shall not be irrigated with an irrigation system with an application rate exceeding 0.75 inches per hour.

  • Maximum slope for turf adjacent to hardscape25 pct

    Turf is not allowed on slopes greater than 25 percent where the toe of the slope is adjacent to an impermeable hardscape.

  • New development projects with an aggregate landscape area equal to or greater than 500 square feet.

  • Rehabilitated landscape projects with an aggregate landscape area equal to or greater than 2,500 square feet.

  • Minimum mulch depth3 in

    A minimum three inch layer of mulch shall be applied on all exposed soil surfaces of planting areas.

  • Overhead irrigation setbackSetbackThe distance a building must be held back from a lot line. from non-permeable surfaces24 in

    Overhead irrigation shall not be permitted within 24 inches of any non-permeable surface.

  • Soil sampling rate for large projects15 pct

    A soil sampling rate of one in seven lots or approximately 15 percent will satisfy this requirement.

  • Stormwater retention design event1 in

    Landscape areas be designed for capture and infiltration capacity sufficient to prevent runoff from the one inch, 24-hour rain event.

  • Recirculating water systems for water features

    Recirculating water systems shall be used for water features.

  • Landscape water meters shall be installed for all nonresidential irrigated landscapes of 1,000 square feet but not more than 5,000 square feet.

  • Residential irrigated landscapes of 5,000 square feet or greater require a landscape water meter.

From the ordinance

ETAF for the landscape project does not exceed a factor of 0.55 for residential areas and 0.45 for nonresidential areas... compost at a rate of a minimum of four cubic yards per 1,000 square feet... minimum three inch layer of mulch...
Chapter 19.570