Riverside, California · District

AI-3

Air Industrial Zone 3
IndustrialAir IndustrialAll Riverside districts0

Dimensional standards

AI-3 lot requirementsSTREETbuildable areaFront 50 ftRear 50 ft
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Uses

Prohibited23

Extracted standards

6 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Fencing & walls

Other

From the ordinance

The side or rear yard setback shall be the same as the required front yard setback wherever a side or rear yard abuts any lot zoned for residential use. A minimum front yard setback of 50 feet shall be required and maintained wherever a lot or parcel in any industrial zone abuts or is adjacent to a lot or parcel in any residential zone or use.
19.130.030

Use details

{
  "dropped_conditions": {
    "prohibited_uses": [
      "Cement, lime, gypsum or plaster of Paris manufacture, except that the manufacture of cement products shall be permitted"
    ]
  }
}