Redwood City, California · General provision

Section 53.2

Dimensional standards

lot requirementsSTREETSide 25 ft
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Uses

Extracted standards

4 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Creek trail surface width10 ft

    The trail shall consist of ten (10) feet of asphalt or other smooth surface with two-foot-wide edge bands of decomposed granite.

  • Redwood Creek Trail right-of-way width14 ft

    The trail right-of-way shall be fourteen (14) feet wide.

  • Minimum building setback from the Redwood Creek Trail shall be twenty-five (25) feet, or approximately thirty-nine (39) feet from creek top-of-bank.

  • Primary entrance location

    Primary entrances shall be located on a street-fronting facade or a street-fronting corner.

From the ordinance

Any other use not explicitly addressed in Table 53-1 is prohibited.
Section 53.2