Redwood City, California · General provision

Table 53-1; Sec. 53.5.A.2.a

Dimensional standards

lot requirementsSTREETFront 25 ftSide 25 ft
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Uses

Extracted standards

4 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Lighting

  • Trail lighting spacing100 ft

    Trail improvements shall include pedestrian-oriented lighting at a minimum spacing of one hundred (100) feet on center.

Other

  • Creek trail surface width10 ft

    The trail shall consist of ten (10) feet of asphalt or other smooth surface with two-foot-wide edge bands of decomposed granite

  • Creek trail right-of-way width14 ft

    The trail right-of-way shall be fourteen (14) feet wide.

Setback

From the ordinance

Minimum building setback from the Redwood Creek Trail shall be twenty-five (25) feet, or approximately thirty-nine (39) feet from creek top-of-bank.
Table 53-1; Sec. 53.5.A.2.a