Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Sanitary sewer connection required
Each lot intended for development shall be served by an approved sanitary sewer lateral connection.
- Underground utilities required
Each lot intended for development shall be served by lateral connections for underground electric, telephone, cable television, and natural gas (if available).
- Water supply connection required
Each lot intended for development shall be served by an approved water-system connection capable of providing sufficient flows and pressure for domestic use and required fire protection.
From the ordinance
Each lot intended for development shall be served by an approved sanitary sewer lateral connection. ... Each lot intended for development shall be served by an approved water-system connection...