Dimensional standards
Servicing
- Geographic extent
- Citywide
Extracted standards
18 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Abandonment period90 days
The permittee notifies the director that it abandoned the use of a facility for a continuous period of 90 days
- Maximum individual antenna volume3 cuft
No individual antenna on the proposed wireless telecommunications facility exceeds three cubic feet in volume
- Community meeting lead time28 days
Hold a community meeting at least four weeks before the date of the planning commission meeting at which the application will be heard
- Community meeting notice radius500 ft
Send written notice to both the owner(s) of real property, as shown on the latest equalized assessment roll, within 500 feet of the proposed wireless telecommunications facility
- Compliance report submittal period30 days
Within 30 days after installation or modification of a WTF, the applicant shall deliver to the director a written report that demonstrates that its WTF as constructed and normally operating fully complies with the conditions of the permit
- Maximum cumulative antenna volume on a pole9 cuft
The cumulative antenna volume on any single pole does not exceed nine cubic feet
- Decommission notice period30 days
Any permittee that intends to decommission a wireless telecommunications facility must send 30-days prior written notice by certified U.S. mail to the director.
- Exempt facilities
This chapter does not apply to the following: 1. Amateur radio facilities; 2. Over-the-air reception devices (OTARD) antennas, up to three on a property; 3. Facilities owned and operated by the city for its use
- HeightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. limit for wireless facilities
No tower or antenna of any wireless telecommunications facility shall exceed the zone height limit of the zone upon which the wireless telecommunications facility is located
- Mock-up duration15 days
A mock-up including all proposed antenna structures, antennas, cables, hardware and related accessory equipment shall be constructed at least 15 consecutive calendar days, for 24 hours a day, prior to a public hearing
- Mock-up removal period7 days
Said mock-up shall remain in place until completion of any appeal process and shall be removed within seven calendar days of any final decision.
- Maximum noise increase from wireless facility1 dBA
the ambient noise emitted from all the proposed accessory equipment will not, both individually and cumulatively, exceed a one dBA increase over ambient noise levels as measured from the property line of any residential property
- Permit required for wireless facilities
Prior to the installation of a new wireless telecommunications facility or a modification or collocation to an existing wireless telecommunications facility... the owner... shall first obtain a conditional wireless facility permit or administrative wireless facility permit
- Permit term10 years
it is the intent to limit the duration of WTF permits, in most cases, to terms of ten years
- Minimum distance from dwelling for conditionalConditional useAllowed only after a discretionary approval — usually a public hearing and a board vote. wireless facility200 ft
No wireless communications facility proposed within 200 feet from any dwelling lawfully used or approved for a residential use may not be approved unless the proposed facility meets all of the following criteria
- Minimum distance from dwelling for administrative wireless facility200 ft
No concealed wireless telecommunications facility proposed within 200 feet from any dwelling used or approved for a residential use may be permitted unless the proposed facility meets all of the following criteria
- Minimum distance from street intersection200 ft
and a minimum of 200 feet from any street intersection.
- Minimum distance from other wireless facility200 ft
the proposed wireless telecommunications facility must be located a minimum of 200 feet from any other wireless telecommunications facility located along the same side of a street
From the ordinance
No tower or antenna of any wireless telecommunications facility shall exceed the zone height limit of the zone upon which the wireless telecommunications facility is located