Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Accessory dwelling units
- Approval timeframe60 days
An application to create or serve an ADU or JADU on a lot with an existing dwelling that meets all applicable standards described in this chapter shall be approved or denied ministerially within 60 days after receiving a completed application, without need for a hearing and notwithstanding any ordinance regulating the issuance of variances or special use permits.
- Ministerial approval required
shall be allowed on any lot zoned for single-family or multifamily residential, on lots with existing or proposed single-family dwelling units, with ministerial approval of a site plan review by the director.
- No conversion to primary for 20 years20 years
Any new ADU or JADU may not be converted to primary dwelling unit space for a minimum of 20 years from construction.
From the ordinance
ADUs and/or JADUs, either attached or detached, which adhere to the standards in Sections 17.10.020, 17.10.030, or 17.10.040, shall be allowed on any lot zoned for single-family or multifamily residential, on lots with existing or proposed single-family dwelling units, with ministerial approval of a site plan review by the director.