Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Underground utilities required for new construction
All utility lines installed to serve new construction shall be placed underground.
From the ordinance
All utility lines installed to serve new construction shall be placed underground from an existing power pole or other point of connection off-site. ... Additions to single-family residential buildings are exempted.