Rancho Palos Verdes, California · General provision

17.54.020

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Underground utilities required

    All utility lines installed to serve new construction shall be placed underground from an existing power pole or other point of connection off-site.

From the ordinance

All utility lines installed to serve new construction shall be placed underground from an existing power pole or other point of connection off-site.
17.54.020