Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Underground utilities required
All utility lines installed to serve new construction shall be placed underground from an existing power pole or other point of connection off-site.
From the ordinance
All utility lines installed to serve new construction shall be placed underground from an existing power pole or other point of connection off-site.