Highlighted below: 40 of 60 extracted standards. Sections and highlights carry their own anchors. The rest quote wording that differs from this rendering of the text.
ARTICLE V - OVERLAY ZONING DISTRICTS#
DIVISION 1. - ESTABLISHMENT AND PURPOSE#
Sec. 90-291. - Established.#
This article establishes overlay districts, which apply additional standards to the development and design requirements of land in the city. These district standards exist as overlays to the existing underlying zoning districts, and, as such, the provisions for the overlay districts do not replace, but shall serve to supplement the underlying district provisions. The city has the following overlay zoning district(s):
Table 5.1 Overlay Zoning Districts
| District | Name |
|---|---|
| FH | Flood hazard overlay district |
Sec. 90-292. - Purpose and intent.#
(a) Flood hazard overlay district (FH). The purpose of the flood hazard overlay district provisions are to prevent:
(1) The loss of life and property;
(2) The creation of health and safety hazards;
(3) The disruption of commerce and governmental services;
(4) The extraordinary and unnecessary expenditure of public funds for flood protection and relief; and
(5) The impairment of the tax base by:
a. Requiring all those uses, activities, and developments that occur in flood-prone areas to be protected and/or flood-proofed against flooding and flood damage;
b. Regulating uses, activities, and development which, alone or in combination with other existing or future uses, activities, and development, will cause unacceptable increases in flood heights, velocities, and frequencies;
c. Restricting or prohibiting certain uses, activities, and development from locating within areas subject to flooding; and
d. Protecting individuals from buying land and structures, which are unsuited for intended purposes because of flood hazards.
DIVISION 2. - FLOOD HAZARD OVERLAY DISTRICT (FH)#
Sec. 90-301. - Definitions.#
For the purposes of this division, the following terms shall have the meaning ascribed to them, unless the context clearly requires otherwise:
100-year flood means the flood having a one percent chance of being equaled or exceeded in any given year. It does not imply that no greater flood is likely to occur, nor that such a flood will not happen more often than once every 100 years.
Base flood, for the purposes of this division, means the 100-year flood. The flood having a one percent chance of being equaled or exceeded in any given year.
Base flood elevation means the Federal Emergency Management Agency (FEMA) designated 100-year water surface elevation. The water surface elevation of the base flood in relation to the datum specified on the community's flood insurance rate map. For the purposes of this division, the 100-year flood or one percent annual chance flood.
Basement means any area of the building having its floor surface sub-grade (below ground level) on any side.
Development means any man-made change to improved or unimproved real estate, including but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavating, or drilling operations or storage of equipment or materials.
Elevated building means a non-basement building built to have the lowest floor elevated above the ground level by means of fill, solid foundation perimeter walls, pilings, or columns (post and piers).
Encroachment, for the purposes of this division, means the advance or infringement of uses, plant growth, fill, excavation, buildings, permanent structures, or development into a floodplain, which may impede or alter the flow capacity of a floodplain.
Existing construction means structures for which the start of construction commenced before the effective date of the FIRM. "Existing construction" may also be referred to as "existing structures" and "pre-FIRM."
Existing structure. See existing construction.
Federal Emergency Management Agency (FEMA) means an independent agency of the United States government that provides a single point of accountability for all federal emergency preparedness and mitigation and response activities.
Fill means the placing of any material which results in increasing the natural ground surface elevation.
Flood or flooding means:
(1) A general and temporary condition of partial or complete inundation of normally dry land areas from:
a. The overflow of inland or tidal waters;
b. The unusual and rapid accumulation or runoff of surface waters from any source; or
c. Mudflows which are proximately caused by flooding as defined in [subsection b] above, and are akin to a river of liquid and flowing mud on the surfaces of normally dry land areas, as when earth is carried by a current of water and deposited along the path of the current.
(2) The collapse or subsidence of land along the shore of a lake or other body of water as a result of erosion or undermining caused by waves or currents of water exceeding anticipated cyclical levels or suddenly caused by an unusually high water level in a natural body of water, accompanied by a severe storm, or by an unanticipated force of nature such as flash flood or an abnormal tidal surge, or by some similarly unusual and unforeseeable event which results in flooding as defined in [subsection (1)a] above.
Flood hazard district means the land located within the base flood area which includes the floodway and the approximated floodplain district.
Flood insurance rate map (FIRM) means an official map of a community, on which FEMA has delineated both the areas of special flood hazard and the risk premium zones applicable to the community. A FIRM that has been made available digitally is called a digital flood insurance rate map (DFIRM).
Flood insurance study (FIS) means an examination, evaluation, and determination of flood hazards and, if appropriate, corresponding water surface elevations, or an examination, evaluation, and determination of mudflow and/or flood-related erosion hazards.
Floodplain or flood-prone area means any land susceptible to being inundated by water from any source.
Floodproofing means a combination of design modifications that results in a building or structure that is subject to flooding, including the attendant utility and sanitary facilities, being watertight with walls substantially impermeable to the passage of water.
Floodway means the channel of a river or other watercourse and the adjacent land areas that must be reserved to discharge the base flood without cumulatively increasing the water surface elevation more than one foot at any point within the community.
Floodway fringe. The floodway fringe encompasses the portion of the floodplain that could be completely obstructed without increasing the base flood elevation by more than one foot at any point.
Freeboard means a factor of safety usually expressed in inches or feet above a flood level for purposes of floodplain management. "Freeboard" tends to compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as wave action, bridge openings, and the hydrological effect of urbanization in the watershed.
Highest adjacent grade means the highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure.
Historic structure means any structure that is:
(1) Listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register;
(2) Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district;
(3) Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of the Interior; or
(4) Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either:
a. By an approved state program as defined by the Secretary of the Interior; or,
b. Directly by the Secretary of the Interior in states without approved programs.
Hydrological and hydraulic engineering analysis means analyses performed by a licensed professional engineer, in accordance with standard engineering practices that are accepted by the state department of conservation and recreation (DCR) and FEMA, used to determine the base flood, other frequency floods, flood elevations, floodway information and boundaries, and flood profiles.
Letters of map change (LOMC) means an official FEMA determination, by letter, that amends or revises an effective FIRM or FIS. Letters of map change include:
(1) Letter of map amendment (LOMA). An amendment based on technical data showing that a property was incorrectly included in a designated special flood hazard area. A LOMA amends the current effective FIRM and establishes that a land as defined by metes and bounds, or structure is not located in a special flood hazard area.
(2) Letter of map revision (LOMR). A revision based on technical data that may show changes to flood zones, flood elevations, floodplain and floodway delineations, and planimetric features. A letter of map revision based on fill (LOMR-F) is a determination that a structure or parcel of land has been elevated by fill above the base flood elevation and is, therefore, no longer exposed to flooding associated with the base flood. To qualify for this determination, the fill must have been permitted and placed in accordance with the community's floodplain management regulations.
(3) Conditional letter of map revision (CLOMR). A formal review and comment as to whether a proposed flood protection project or other project complies with the minimum NFIP requirements for such projects with respect to delineation of special flood hazard areas. A CLOMR does not revise the effective FIRM or FIS.
Lowest adjacent grade means the lowest natural elevation of the ground surface next to the walls of a structure.
Lowest floor means the floor of the lowest enclosed area, including basement, but excluding any unfinished or flood-resistant enclosure, usable solely for vehicle parking, building access, or limited storage provided that such enclosure is not built to render the structure in violation of the applicable non-elevation design requirements of 44 CFR 60.3.
Manufactured home means a structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when connected to the required utilities. For floodplain management purposes the term "manufactured home" also includes park trailers, travel trailers, and other similar vehicles placed on a site for greater than 180 consecutive days.
Manufactured home park or subdivision means a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.
New construction, for the purposes of determining insurance rates, means structures for which the "start of construction" commenced on or after February 2, 1989, and includes any subsequent improvements to such structures. For floodplain management or development purposes, new construction means structures for which the start of construction commenced on or after the effective date of a floodplain management regulation adopted by the city and includes any subsequent improvements to such structures.
Post-FIRM structures means a structure for which construction or substantial improvement occurred on or after February 2, 1989.
Pre-FIRM structures means a structure for which construction or substantial improvement occurred on or before February 2, 1989.
Recreational vehicle means a vehicle which is:
(1) Built on a single chassis;
(2) Four hundred square feet or less when measured at the largest horizontal projection;
(3) Designed to be self-propelled or towable; and
(4) Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational camping, travel, or seasonal use.
Repetitive loss structure means a building covered by a contract for flood insurance that has incurred flood-related damages on two occasions in a ten-year period, in which the cost of the repair, on the average, equaled or exceeded 25 percent of the market value of the structure at the time of each such flood event; and at the time of the second incidence of flood-related damage, the contract for flood insurance contains increased cost of compliance coverage.
Severe repetitive loss structure means a structure that:
(1) Is covered under a contract for flood insurance made available under the NFIP; and
(2) Has incurred flood related damage:
a. For which four or more separate claims payments have been made under flood insurance coverage with the amount of each such claim exceeding $5,000.00, and with the cumulative amount of such claims payments exceeding $20,000.00; or
b. For which at least two separate claims payments have been made under such coverage, with the cumulative amount of such claims exceeding the market value of the insured structure.
Shallow flooding area means a special flood hazard area with base flood depths from one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.
Special flood hazard area (SFHA) means the land in the floodplain subject to a one percent or greater chance of being flooded in any given year as determined in section 90-316 of article V.
Start of construction means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement, substantial improvement, or other improvement was within 180 days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading, and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms. For a substantial improvement, the actual start of the construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
Structure, for floodplain management purposes, means a walled and roofed building, including a gas or liquid storage tank, that is principally above ground, as well as a manufactured home.
Substantial damage means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred.§
Substantial improvement means any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds 50 percent of the market value of the structure before the start of construction of the improvement.§ This term includes structures which have incurred substantial damage regardless of the actual repair work performed. The term does not, however, include either:
(1) Any project for improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications which have been identified by the local code enforcement official and which are the minimum necessary to assure safe living conditions; or
(2) Any alteration of a historic structure, provided that the alteration will not preclude the structure's continued designation as a historic structure.
Violation means the failure of a structure or other development to be fully compliant with the city's floodplain management regulations in this division. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in section 60.3(d)(3) of the National Flood Insurance Program regulations, is presumed to be in violation until such time as that documentation is provided.
Watercourse means a lake, river, creek, stream, wash, channel, or other topographic feature on or over which waters flow at least periodically. Watercourse includes specifically designated areas in which substantial flood damage may occur.
Zone, A means those areas for which no detailed flood profiles or elevations are provided, but the one percent annual chance floodplain boundary has been approximated.
Zone, AE means a flood hazard zone with two categories defined below as:
(1) Category 1 areas shall be those areas for which one percent annual chance flood elevations have been provided and the floodway has been delineated.
(2) Category 2 areas on the FIRM accompanying the FIS shall be those areas for which one percent annual chance flood elevations have been provided and the floodway has not been delineated.
Zone, X means those areas of two-tenths percent annual chance flood or areas of one percent annual chance flood with average depths of less than one foot or with drainage areas less than one square mile.
Sec. 90-302. - Authority.#
[Text not provided in source material.]
Sec. 90-303. - Applicability.#
[Text not provided in source material.]
Sec. 90-304. - Compliance and liability.#
[Text not provided in source material.]
Sec. 90-305. - Abrogation and greater restrictions.#
[Text not provided in source material.]
Sec. 90-306. - Penalty for violations.#
[Text not provided in source material.]
Sec. 90-307. - Designation of the administrator.#
[Text not provided in source material.]
Sec. 90-308. - Duties and responsibilities of the administrator.#
[Text not provided in source material.]
Sec. 90-309. - Records.#
[Text not provided in source material.]
Sec. 90-310. - Use and interpretation of FIRMs.#
[Text not provided in source material.]
Sec. 90-311. - Jurisdictional boundary changes.#
[Text not provided in source material.]
Sec. 90-312. - District boundary changes.#
[Text not provided in source material.]
Sec. 90-313. - Interpretation of district boundaries.#
[Text not provided in source material.]
Sec. 90-314. - Submitting technical data.#
[Text not provided in source material.]
Sec. 90-315. - Letters of map revision.#
[Text not provided in source material.]
Sec. 90-316. - Establishment of flood hazard zones.#
[Text not provided in source material.]
Sec. 90-317. - Permitted uses in flood hazard zones.#
[Text not provided in source material.]
Sec. 90-318. - Development in flood hazard zones.#
[Text not provided in source material.]
Sec. 90-319. - Permits and applications.#
[Text not provided in source material.]
Sec. 90-320. - Elevation and construction standards.#
[Text not provided in source material.]
Sec. 90-321. - Design criteria for utilities and facilities.#
[Text not provided in source material.]
Sec. 90-322. - Existing structures in floodplain areas.#
[Text not provided in source material.]
Sec. 90-323. - Variances.#
[Text not provided in source material.]
ARTICLE II. - FLOOD HAZARD OVERLAY DISTRICT#
Sec. 90-302. - Authority.#
This division is adopted pursuant to the authority granted to localities by Code of Virginia, § 15.2-2280, as amended, and may be referred to as the city flood hazard overlay district, flood hazard overlay, floodplain overlay, or floodplain regulations.
Sec. 90-303. - Applicability.#
These provisions shall apply to all lands within the jurisdiction of the city and identified as special flood hazard areas (SFHAs) identified by the city or shown on the flood insurance rate map (FIRM) or included in the flood insurance study (FIS) that are provided to the city by the Federal Emergency Management Agency (FEMA).
Sec. 90-304. - Compliance and liability.#
(a) No land shall hereafter be developed, and no structure shall be located, relocated, constructed, reconstructed, enlarged, or structurally altered except in full compliance with the terms and provisions of this division, and any other applicable ordinances and regulations which apply to uses within the jurisdiction of this ordinance.
(b) The degree of flood protection sought by the provisions of this division is considered reasonable for regulatory purposes and is based on acceptable engineering methods of study. Larger floods may occur on rare occasions. Flood heights may be increased by man-made or natural causes, such as ice jams and bridge openings restricted by debris. This division does not imply that areas outside the floodplain area or that land uses permitted within such area will be free from flooding or flood damages.
(c) This division shall not create liability on the part of the city or any officer or employee thereof for any flood damages that result from reliance on this division, or any administrative decision lawfully made there under.
Sec. 90-305. - Abrogation and greater restrictions.#
(a) This division supersedes any locally adopted flooding regulations currently in effect in flood-prone districts. Any regulations, however, shall remain in full force and effect to the extent that its provisions are more restrictive.
(b) These regulations are not intended to repeal or abrogate any existing ordinances including zoning and/or subdivision ordinances or building codes. In the event of a conflict between these regulations and any other ordinance, the more restrictive shall govern.
Sec. 90-306. - Penalty for violations.#
(a) Any person who fails to comply with any of the requirements or provisions of this division, or directions of the administrator, or any other authorized employee of the city, shall be subject to the penalties pursuant to the Code of Virginia, and as outlined in the VA Uniform Statewide Building Code (USBC) for building code violations, and article II, division 4, enforcement, of this ordinance for violations and associated penalties.
(b) In addition to the above penalties, all other actions are hereby reserved, including an action in equity for the proper enforcement of this division.
(c) The imposition of a fine or penalty for any violation of, or noncompliance with, this division shall not excuse the violation or noncompliance or permit it to continue; and all such persons shall be required to correct or remedy such violations within a reasonable time.
(d) Any structure constructed, reconstructed, enlarged, altered, or relocated in noncompliance with this division may be declared by the city to be a public nuisance and abatable as such.
(e) Flood insurance may be withheld from structures constructed in violation of this division.
Sec. 90-307. - Designation of the administrator.#
The city shall appoint a designee to administer and implement the regulations of this division, referred to herein as the administrator. The administrator may:
(1) Administer the duties and responsibilities herein.
(2) Delegate duties and responsibilities set forth in these regulations to qualified technical personnel, plan examiners, inspectors, and other employees.
(3) Enter into a written agreement or written contract with another community or private sector entity to administer specific provisions of these regulations. Administration of any part of these regulations by another entity shall not relieve the community of its responsibilities pursuant to the participation requirements of the National Flood Insurance Program as set forth in the Code of Federal Regulations at 44 CFR 59.22.
Sec. 90-308. - Duties and responsibilities of the administrator.#
The duties and responsibilities of the administrator shall include but are not limited to:
(1) Review applications for permits to determine whether proposed activities will be located in a SFHA.
(2) Interpret floodplain boundaries and provide available base flood elevation and flood hazard information.
(3) Review applications to determine whether proposed activities will be reasonably safe from flooding and require new construction and substantial improvements to meet the requirements of these regulations.
(4) Review applications to determine whether all necessary permits have been obtained from the federal, state, or local agencies from which prior or concurrent approval is required; in particular, permits from state agencies for any construction, reconstruction, repair, or alteration of a dam, reservoir, or waterway obstruction (including bridges, culverts, structures), any alteration of a watercourse, or any change of the course, current, or cross section of a stream or body of water, including any change to the 100-year frequency floodplain of free flowing non-tidal waters of the state.
(5) Verify that an applicant proposing to alter a watercourse has notified adjacent local governments, the Department of Conservation and Recreation Division of Dam Safety and Floodplain Management (DCR), the Virginia Department of Environmental Quality (DEQ) and the US Army Corp of Engineers (USACE) and has submitted copies of such notifications to FEMA.
(6) Approve applications and issue permits to develop in SFHA if the provisions of this division have been met or disapprove applications if the provisions of this division have not been met.
(7) Inspect, or cause to be inspected, prospective buildings, structures, and other prospective development for which permits have been issued to determine compliance with this division or to determine if noncompliance has occurred or violations have been committed.
(8) Review elevation certificates and require incomplete or deficient certificates to be corrected.
(9) Submit to FEMA, or require to be submitted to FEMA, at the applicant's expense, data, and information necessary to maintain FIRMs, including hydrologic and hydraulic engineering analyses prepared by or for the city, within six months after such data and information becomes available if the analysis indicates changes in base flood elevations.
(10) Maintain and permanently keep records that are necessary for the administration of these regulations, including:
a. Copies of FISs, FIRMS (including historic studies and maps and current effective studies and maps), and letters of map change (LOMC); and
b. Documentation supporting issuance and denial of permits, elevation certificates, documentation of the elevation (in relation to the datum on the FIRM) to which structures have been floodproofed, other required design certifications, variances, and records of enforcement actions taken to correct violations of these regulations.
(11) Enforce the provisions of these regulations, investigate violations, issue notices of violation, and require permit holders to take corrective action.
(12) Advise the board of zoning appeals regarding the intent of these regulations and, for each application for a variance, prepare a staff report and recommendation.
(13) Administer the requirements related to proposed work on existing buildings:
a. Make determinations as to whether buildings and structures that are in SFHA that are damaged by any cause have been substantially damaged.
b. Make reasonable efforts to notify owners of substantially damaged structures of the need to obtain a permit to repair, rehabilitate, or reconstruct the structure. Prohibit the repair of a substantially damaged building without a permit, except for temporary emergency protective measures necessary to secure a property or to stabilize a building or structure to prevent additional damage.
(14) Undertake, as determined appropriate by the administrator due to the circumstances, other actions, which may include but are not limited to: issuing press releases, public service announcements, and other public information materials related to permit requests and repair of damaged structures; coordinating with other federal, state, and local agencies to assist with substantial damage determinations; providing owners of damaged structures information related to the proper repair of damaged structures in SFHAs and assisting property owners with documentation necessary to file claims for increased cost of compliance coverage under National Flood Insurance Program (NFIP) flood insurance policies.
(15) Notify FEMA when the corporate boundaries of the city have been modified and:
a. Provide a map that clearly delineates the new corporate boundaries or the new area for which the authority to regulate pursuant to these regulations has either been assumed or relinquished through annexation; and
b. If the FIRM for any annexed area includes special flood hazard areas that have flood zones that have regulatory requirements that are not set forth in these regulations, prepare amendments to these regulations to adopt the FIRM and appropriate requirements, and submit the amendments to the governing body for adoption; such adoption shall take place at the same time as or prior to the date of annexation and a copy of the amended regulations shall be provided to DCR and FEMA.
(16) Upon the request of FEMA, complete and submit a report concerning participation in the NFIP, which may request information regarding the number of buildings in the SFHA, number of permits issued for development in the SFHA, and number of variances issued for development in the SFHA.
(17) It is the duty of the administrator to consider flood, mudslide, and flood-related erosion hazards, to the extent that they are known, in all official actions relating to land management and use throughout the entire jurisdictional area of the city, whether or not those hazards have been specifically delineated geographically (e.g. via mapping or surveying).
Sec. 90-309. - Records.#
Records of actions associated with administering this division shall be kept on file and maintained by the administrator or their designee.
Sec. 90-310. - Use and interpretation of FIRMs.#
The administrator shall make interpretations, where needed, as to the exact location of SFHA, floodplain boundaries, and floodway boundaries. The following shall apply to the use and interpretation of FIRMs and data:
(1) Where field surveyed topography indicates that adjacent ground elevations:
a. Are below the base flood elevation in riverine SFHAs, even in areas not delineated as a SFHA on a FIRM, the area shall be considered as a SFHA and subject to the requirements of these regulations; or
b. Are above the base flood elevation, the area shall be regulated as a SFHA unless the applicant obtains a LOMC that removes the area from the SFHA.
(2) In FEMA-identified SFHAs where base flood elevation and floodway data have not been identified and in areas where FEMA has not identified SFHAs, any other flood hazard data available from a federal, state, or other source shall be reviewed and reasonably used.
(3) Base flood elevations and designated floodway boundaries on FIRMs and in FISs shall take precedence over base flood elevations and floodway boundaries by any other sources if such sources show reduced floodway widths and/or lower base flood elevations.
(4) Other sources of data shall be reasonably used if such sources show increased base flood elevations and/or larger floodway areas than are shown on FIRMs and in FISs.
(5) If a preliminary FIRM and/or a preliminary FIS has been provided by FEMA:
a. Upon the issuance of a letter of final determination (LOFD) by FEMA, the preliminary flood hazard data shall be used and shall replace the flood hazard data previously provided from FEMA for the purposes of administering these regulations.
b. Prior to the issuance of a LOFD by FEMA, the use of preliminary flood hazard data shall be deemed the best available data pursuant to section 90-316 as defined by this division and used where no base flood elevations and/or floodway areas are provided on the effective FIRM.
c. Prior to issuance of a LOFD by FEMA, the use of preliminary flood hazard data is permitted where the preliminary base flood elevations or floodway areas exceed the base flood elevations and/or designated floodway widths in existing flood hazard data provided by FEMA. Such preliminary data may be subject to change and/or appeal to FEMA.
Sec. 90-311. - Jurisdictional boundary changes.#
(a) The county flood hazard overlay in effect on the date of annexation shall remain in effect and shall be enforced by the municipality for all annexed areas until the municipality adopts and enforces an ordinance which meets the requirements for participation in the NFIP. The city shall pass a resolution acknowledging and accepting responsibility for enforcing floodplain ordinance standards prior to annexation of any area containing identified flood hazards. If the FIRM for any annexed area includes SFHAs with flood zones that have regulatory requirements that are not set forth in these regulations, the governing body shall prepare amendments to these regulations to adopt the FIRM and appropriate requirements, and submit the amendments to the governing body for adoption; such adoption shall take place at the same time as or prior to the date of annexation and a copy of the amended regulations shall be provided to DCR Division of Dam Safety and Floodplain Management and FEMA.
(b) In accordance with the Code of Federal Regulations, title 44, subpart (B), section 59.22(a)(9)(v), all NFIP participating communities must notify the Federal Insurance Administration and optionally the state coordinating office in writing whenever the boundaries of the community have been modified by annexation or the community has otherwise assumed or no longer has authority to adopt and enforce floodplain management regulations for a particular area.
(c) To ensure that all FIRMs accurately represent the community's boundaries, a copy of a map of the community suitable for reproduction, clearly delineating the new corporate limits or new area for which the community has assumed, or relinquished floodplain management regulatory authority must be included with the notification.
Sec. 90-312. - District boundary changes.#
The delineation of the flood hazard overlay district may be revised by the city council where natural or man-made changes have occurred and/or where more detailed studies have been conducted or undertaken by the U.S. Army Corps of Engineers or other qualified agency or an individual documents the need for such change. However, prior to any such change, approval must be obtained from FEMA. An approved letter of map revision (LOMR) serves as record of this change.
Sec. 90-313. - Interpretation of district boundaries.#
Initial interpretations of the boundaries of the flood hazard overlay district shall be made by the administrator or designee. Should a dispute arise concerning the boundaries of any of the districts, the BZA shall make the necessary determination in accordance with article III, permits and applications, of this ordinance. The person questioning or contesting the location of the district boundary shall be given a reasonable opportunity to present their case to the BZA and to submit his own technical evidence if they so desire.
Sec. 90-314. - Submitting technical data.#
A community's base flood elevations may increase or decrease resulting from physical changes affecting flooding conditions. As soon as practicable, but not later than six months after the date such information becomes available, the city shall notify the Federal Insurance Administrator of the changes by submitting technical or scientific data. Such a submission is necessary so that upon confirmation of those physical changes affecting flooding conditions, risk premium rates, and floodplain management requirements will be based upon current data.
Sec. 90-315. - Letters of map revision.#
When development in the floodplain will cause or causes a change in the base flood elevation, the applicant, including state agencies, must notify FEMA by applying for a conditional letter of map revision (CLOMR) or a LOMR. Examples include:
- Any development that causes a rise in the base flood elevations within the floodway.
- Any development occurring in zone AE without a designated floodway, which will cause a rise of more than one foot in the base flood elevation.
- Alteration or relocation of a stream (including but not limited to installing culverts and bridges) 44 CFR 65.3 and 65.6(a)(12).
Sec. 90-316. - Establishment of flood hazard zones.#
(a) Basis of flood hazard zones.#
- The various flood hazard zones shall include special flood hazard areas (SFHA). The basis for the delineation of these zones shall be the FIS and FIRM for the city and incorporated areas prepared by FEMA, Federal Insurance Administration, dated July 7, 2009, and any subsequent revisions or amendments thereto.
- The city may identify and regulate local flood hazard or ponding areas that are not delineated on the FIRM. These areas may be delineated on a "local flood hazard map" using best available topographic data and locally derived information such as flood of record, historic high-water marks, or approximated study methodologies.
- The boundaries of the SFHA and flood hazard zones are established as shown on the FIRM, which is declared to be a part of this division and shall be kept on file at the city planning and zoning department.
(b) Description of flood hazard zones.#
The flood hazard zones described below shall constitute the flood hazard overlay district. It shall be an overlay to the existing underlying zoning districts as shown on the official zoning ordinance map, and as such, the provisions for the flood hazard overlay district shall serve as a supplement to the underlying district provisions.
- Floodway areas. Those areas in an AE zone(s) and delineated, for purposes of this division, using the criterion that certain areas within the floodplain must be capable of carrying the water of the one percent annual chance flood without increasing the water surface elevation of that flood more than one foot at any point. These areas included in this flood hazard overlay district are specifically defined in table 2 of the city FIS and shown on the accompanying FIRM.
- AE Zone. A flood hazard zone with two categories:
- a. Category 1 areas shall be those areas for which one percent annual chance flood elevations have been provided and the floodway has been delineated.
- b. Category 2 areas on the FIRM accompanying the FIS shall be those areas for which one percent annual chance flood elevations have been provided and the floodway has not been delineated.
- A Zone. Those areas for which no detailed flood profiles or elevations are provided, but the one percent annual chance floodplain boundary has been approximated.
- X Zone. Other flood districts shall be those areas identified as zone X on the FIRM. This zone includes areas of two-tenths percent annual chance flood or areas of one percent annual chance flood with average depths of less than one foot or with drainage areas less than one square mile.
Sec. 90-317. - Permitted uses in flood hazard zones.#
In the flood hazard overlay district, the following uses and activities are permitted, provided that they are in compliance with the provisions of the underlying district and are not prohibited by any other ordinance:
Table 5.2 Permitted Uses in Flood Hazard Zones
| Use | AE | A | X |
|---|---|---|---|
| Uses consisting of development of a structure, where the effect of such development on flood heights is fully offset by accompanying improvements which have been approved by all appropriate local and/or state authorities, as required in this division. | P | ||
| Accessory structures consisting of 200 sq. ft. or less. | P | P | P |
| Agricultural uses, such as general farming, pasture, grazing, outdoor-plant nurseries, horticulture, truck farming, forestry, sod farming and wild crop harvesting. | P | P | P |
| Public and private recreational uses and activities, such as parks, day camps, picnic grounds, golf courses, boat launching and swimming area, horseback riding and hiking trails, wildlife and nature preserves and hunting and fishing areas. | P | P | P |
| Accessory residential uses, such as yard areas, gardens, play areas, and parking areas. | P | P | P |
| Accessory industrial and commercial uses, such as yard areas, previous parking and loading areas, etc. | P | P | P |
P = Permitted Blank = Not Permitted
Sec. 90-318. - Development in flood hazard zones.#
(a) Development in floodway areas.#
- Within any designated floodway areas, no encroachments, including fill, new construction, substantial improvements, or other development shall be permitted unless it has been demonstrated through hydrologic and hydraulic analysis performed in accordance with standard engineering practice that the proposed encroachment will not result in any increase in flood levels within the community during the occurrence of the base flood discharge.§
- a. Hydrologic and hydraulic analyses shall be undertaken only by professional engineers or others of demonstrated qualifications, who shall certify that the technical methods used correctly reflect currently accepted technical concepts. Studies, analyses, computations, etc., shall be submitted in sufficient detail to allow a thorough review by the administrator.
- b. If subsection (1) above is satisfied, all new construction and substantial improvements shall comply with all applicable flood hazard reduction provisions of sections 90-320 and 90-321.
- Development activities which increase the water surface elevation of the base flood may be allowed, provided that the applicant first applies—with the city's endorsement—for a conditional letter of map revision (CLOMR) and receives the approval of FEMA.
(b) Development in AE zones.#
- Until a regulatory floodway is designated, no new construction, substantial improvements, or other development (including fill) shall be permitted within AE zones, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the city.§
- Development activities which increase the water surface elevation of the base flood by more than one foot may be allowed, provided that the applicant first applies—with the city's endorsement—for a conditional letter of map revision (CLOMR) and receives the approval of FEMA.
(c) Development in A zones.#
- Until a regulatory floodway is designated, no new construction, substantial improvements, or other development (including fill) shall be permitted within A zones, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the city.§
- Development activities which increase the water surface elevation of the base flood by more than one foot may be allowed, provided that the applicant first applies—with the city's endorsement—for a conditional letter of map revision (CLOMR) and receives the approval of FEMA.
- For these areas, the base flood elevations and floodway information from federal, state, and other acceptable sources shall be used, when available (44 CFR 60.3(b)).
- Where the specific one percent annual chance flood elevation cannot be determined for this area using other sources of data, such as the U.S. Army Corps of Engineers Floodplain Information Reports, U.S. Geological Survey Flood-Prone Quadrangles, etc., then the applicant for the proposed use, development and/or activity shall determine this base flood elevation, in the following manner:
- a. The elevation shall be determined by using the elevation of a point on the boundary of the identified floodplain area which is nearest the construction site.
- b. Studies, analyses, computations, etc., shall be submitted in sufficient detail to allow a thorough review by the administrator.
- c. The administrator reserves the right to require a hydrologic and hydraulic analysis for any development in this zone.
- d. When such base flood elevation data is utilized, the lowest floor shall be 24 inches above the base flood elevation.
Sec. 90-319. - Permits and applications.#
(a) Permit requirement.#
- All uses, activities and development occurring within the flood hazard overlay district shall be undertaken only upon the issuance of a permit.§
- a. Prior to the issuance of any such permit, the administrator shall require all applications to include compliance with all applicable state and federal laws and shall review all sites to assure they are reasonably safe from flooding.
- b. Such development shall be undertaken only in strict compliance with the provisions of this division and with all other applicable codes and ordinances, as amended, such as the VA USBC and this ordinance.
- Under no circumstances shall any use, activity and/or development adversely affect the capacity of the channels or floodways or any watercourse, drainage ditch or any other drainage facility or system.
- a. Prior to any proposed alteration or relocation of any channels or of any watercourse, stream, etc., within the city, a permit shall be obtained from the U.S. Army Corps of Engineers, the Virginia Marine Resources Commission, and the Virginia State Water Control Board.
- b. Further notification of the proposal shall be given to all adjacent jurisdictions, the Division of Dam Safety and Flood Plain Management at the Department of Conservation and Recreation and the Federal Emergency Management Agency.
(b) Site plans and permit applications.#
- All applications for development in the flood hazard overlay district and all building permits issued for the flood hazard overlay district shall incorporate the following information:
- a. The elevation of the base flood at the site;
- b. For structures to be elevated, the elevation of the lowest floor, including basement.
- c. For structures to be floodproofed (non-residential only), the elevation to which the structure will be floodproofed.
- d. Topographic information showing existing and proposed ground elevations.
(c) Standards for subdivision proposals.#
All subdivision proposals shall:
- Any subdivision proposal or other proposed development (including proposals for manufactured home parks and subdivisions) that exceed 50 lots or five acres, whichever is less, in an area where BFE data is not available, or the SFHA has not been delineated, shall include data using detailed methodologies, including a hydraulic and hydrologic analysis, comparable to those contained in a FIS.§ Once identified, those areas shall be subject to the requirements of this division.
- Have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage; and
- Have adequate drainage provided to reduce exposure to flood hazards.§
Sec. 90-320. - Elevation and construction standards.#
In all identified flood hazard areas where base flood elevations have been provided in the FIS or generated by a certified professional in accordance with section 90-316 above, the following provisions shall apply:
(1) General standards.#
The following shall apply to all permits:
- a. New construction and substantial improvements shall be built according to this ordinance and the VA USBC, and anchored to prevent flotation, collapse, or lateral movement of the structure.§
- b. Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for anchoring to resist wind forces.
- c. New construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage.§
- d. New construction or substantial improvements shall be constructed by methods and practices that minimize flood damage.
- e. The flood carrying capacity within an altered or relocated portion of any watercourse shall be maintained.
- f. New construction and replacement of any utilities and facilities shall follow the provisions of section 90-321 of this article.
(2) Residential construction.#
New construction or substantial improvement of any residential structure (including manufactured homes) in zones AE and A, shall have the lowest floor, including basement, elevated to or above the base flood level plus 24 inches.§
(3) Nonresidential construction.#
- a. New construction or substantial improvement of any commercial, industrial, or nonresidential building shall have the lowest floor, including basement, elevated to or above the base flood level plus 24 inches.§
- b. Non-residential buildings located in all A and AE zones may be floodproofed in lieu of being elevated provided that all areas of the building components below the elevation corresponding to the base flood elevation plus two feet are watertight with walls substantially impermeable to the passage of water and use structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy.§ A registered professional engineer or architect shall certify that the standards of this subsection are satisfied.§ Such certification, including the specific elevation to which such structures are floodproofed, shall be maintained by the administrator.
(4) Space below the lowest floor.#
- a. In zones A and AE, fully enclosed areas of new construction or substantially improved structures, which are below the regulatory flood protection elevation shall:
- Not be designed or used for human habitation, but shall be used solely for parking of vehicles, building access, or limited storage of maintenance equipment used in connection with the premises. Access to the enclosed area shall be the minimum necessary to allow for parking of vehicles (garage door) or limited storage of maintenance equipment (standard exterior door), or entry to the living area (stairway or elevator);
- Be constructed entirely of flood resistant materials below the regulatory flood protection elevation; and
- Include measures to automatically equalize hydrostatic flood forces on walls by allowing for the entry and exit of floodwaters. To meet this requirement, the openings must either be certified by a professional engineer or architect or meet the following minimum design criteria:
- (i) Provide a minimum of two openings on different sides of each enclosed area subject to flooding.
- (ii) The total net area of all openings must be at least one square inch for each square foot of enclosed area subject to flooding.§
- (iii) If a building has more than one enclosed area, each area must have openings to allow floodwaters to automatically enter and exit.
- (iv) The bottom of all required openings shall be no higher than one foot above the adjacent grade.
- (v) Openings may be equipped with screens, louvers, or other opening coverings or devices, provided they permit the automatic flow of floodwaters in both directions.
- (vi) Foundation enclosures made of flexible skirting are not considered enclosures for regulatory purposes, and, therefore, do not require openings. Masonry or wood underpinning, regardless of structural status, is considered an enclosure and requires openings as outlined above.
(5) Accessory structures.#
Accessory structures in the SFHA shall comply with the elevation requirements and other requirements of this section or, if not elevated or dry floodproofed, shall:
- a. Not be used for human habitation;
- b. Be limited to no more than 200 square feet in total floor area;§
- c. Be useable only for parking of vehicles or limited storage;
- d. Be constructed with flood damage-resistant materials below the base flood elevation;
- e. Be constructed and placed to offer the minimum resistance to the flow of floodwater;
- f. Be anchored to prevent floatation;
- g. Have electrical service and mechanical equipment elevated to or above the base flood elevation; and
- h. Shall be provided with flood openings which shall meet the following criteria:
- There shall be a minimum of two flood openings on different sides of each enclosed area; if a building has more than one enclosure below the lowest floor, each such enclosure shall have flood openings on exterior walls.
- The total net area of all flood openings shall be at least one square inch for each square foot of enclosed area (non-engineered flood openings), or the flood openings shall be engineered flood openings that are designed and certified by a licensed professional engineer to automatically allow entry and exit of floodwaters; the certification requirement may be satisfied by an individual certification, or an evaluation report issued by the ICC Evaluation Service, Inc.
- The bottom of each flood opening shall be one foot or less above the higher of the interior floor or grade, or the exterior grade, immediately below the opening.
- Any louvers, screens, or other covers for the flood openings shall allow the automatic flow of floodwaters into and out of the enclosed area.
- i. A signed declaration of land restriction (non-conversion agreement) shall be recorded on the property deed.
(6) Recreation vehicles.#
All recreational vehicles placed on sites must either:
- a. Be on the site for fewer than 180 consecutive days and be fully licensed and ready for highway use (a recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick disconnect type utilities and security devices and has no permanently attached additions); or
- b. Meet all the requirements of subsection (1) above.
ARTICLE V - OVERLAY ZONING DISTRICTS#
DIVISION 1. - ESTABLISHMENT AND PURPOSE#
Sec. 90-291. - Established.#
This article establishes overlay districts, which apply additional standards to the development and design requirements of land in the city. These district standards exist as overlays to the existing underlying zoning districts, and, as such, the provisions for the overlay districts do not replace, but shall serve to supplement the underlying district provisions. The city has the following overlay zoning district(s):
Table 5.1 Overlay Zoning Districts
| District | Name |
|---|---|
| FH | Flood hazard overlay district |
Sec. 90-292. - Purpose and intent.#
(a) Flood hazard overlay district (FH). The purpose of the flood hazard overlay district provisions are to prevent:
(1) The loss of life and property;
(2) The creation of health and safety hazards;
(3) The disruption of commerce and governmental services;
(4) The extraordinary and unnecessary expenditure of public funds for flood protection and relief; and
(5) The impairment of the tax base by:
a. Requiring all those uses, activities, and developments that occur in flood-prone areas to be protected and/or flood-proofed against flooding and flood damage;
b. Regulating uses, activities, and development which, alone or in combination with other existing or future uses, activities, and development, will cause unacceptable increases in flood heights, velocities, and frequencies;
c. Restricting or prohibiting certain uses, activities, and development from locating within areas subject to flooding; and
d. Protecting individuals from buying land and structures, which are unsuited for intended purposes because of flood hazards.
DIVISION 2. - FLOOD HAZARD OVERLAY DISTRICT (FH)#
Sec. 90-301. - Definitions.#
For the purposes of this division, the following terms shall have the meaning ascribed to them, unless the context clearly requires otherwise:
100-year flood means the flood having a one percent chance of being equaled or exceeded in any given year. It does not imply that no greater flood is likely to occur, nor that such a flood will not happen more often than once every 100 years.
Base flood, for the purposes of this division, means the 100-year flood. The flood having a one percent chance of being equaled or exceeded in any given year.
Base flood elevation means the Federal Emergency Management Agency (FEMA) designated 100-year water surface elevation. The water surface elevation of the base flood in relation to the datum specified on the community's flood insurance rate map. For the purposes of this division, the 100-year flood or one percent annual chance flood.
Basement means any area of the building having its floor surface sub-grade (below ground level) on any side.
Development means any man-made change to improved or unimproved real estate, including but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavating, or drilling operations or storage of equipment or materials.
Elevated building means a non-basement building built to have the lowest floor elevated above the ground level by means of fill, solid foundation perimeter walls, pilings, or columns (post and piers).
Encroachment, for the purposes of this division, means the advance or infringement of uses, plant growth, fill, excavation, buildings, permanent structures, or development into a floodplain, which may impede or alter the flow capacity of a floodplain.
Existing construction means structures for which the start of construction commenced before the effective date of the FIRM. "Existing construction" may also be referred to as "existing structures" and "pre-FIRM."
Existing structure. See existing construction.
Federal Emergency Management Agency (FEMA) means an independent agency of the United States government that provides a single point of accountability for all federal emergency preparedness and mitigation and response activities.
Fill means the placing of any material which results in increasing the natural ground surface elevation.
Flood or flooding means:
(1) A general and temporary condition of partial or complete inundation of normally dry land areas from:
a. The overflow of inland or tidal waters;
b. The unusual and rapid accumulation or runoff of surface waters from any source; or
c. Mudflows which are proximately caused by flooding as defined in [subsection b] above, and are akin to a river of liquid and flowing mud on the surfaces of normally dry land areas, as when earth is carried by a current of water and deposited along the path of the current.
(2) The collapse or subsidence of land along the shore of a lake or other body of water as a result of erosion or undermining caused by waves or currents of water exceeding anticipated cyclical levels or suddenly caused by an unusually high water level in a natural body of water, accompanied by a severe storm, or by an unanticipated force of nature such as flash flood or an abnormal tidal surge, or by some similarly unusual and unforeseeable event which results in flooding as defined in [subsection (1)a] above.
Flood hazard district means the land located within the base flood area which includes the floodway and the approximated floodplain district.
Flood insurance rate map (FIRM) means an official map of a community, on which FEMA has delineated both the areas of special flood hazard and the risk premium zones applicable to the community. A FIRM that has been made available digitally is called a digital flood insurance rate map (DFIRM).
Flood insurance study (FIS) means an examination, evaluation, and determination of flood hazards and, if appropriate, corresponding water surface elevations, or an examination, evaluation, and determination of mudflow and/or flood-related erosion hazards.
Floodplain or flood-prone area means any land susceptible to being inundated by water from any source.
Floodproofing means a combination of design modifications that results in a building or structure that is subject to flooding, including the attendant utility and sanitary facilities, being watertight with walls substantially impermeable to the passage of water.
Floodway means the channel of a river or other watercourse and the adjacent land areas that must be reserved to discharge the base flood without cumulatively increasing the water surface elevation more than one foot at any point within the community.
Floodway fringe. The floodway fringe encompasses the portion of the floodplain that could be completely obstructed without increasing the base flood elevation by more than one foot at any point.
Freeboard means a factor of safety usually expressed in inches or feet above a flood level for purposes of floodplain management. "Freeboard" tends to compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as wave action, bridge openings, and the hydrological effect of urbanization in the watershed.
Highest adjacent grade means the highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure.
Historic structure means any structure that is:
(1) Listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register;
(2) Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district;
(3) Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of the Interior; or
(4) Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either:
a. By an approved state program as defined by the Secretary of the Interior; or,
b. Directly by the Secretary of the Interior in states without approved programs.
Hydrological and hydraulic engineering analysis means analyses performed by a licensed professional engineer, in accordance with standard engineering practices that are accepted by the state department of conservation and recreation (DCR) and FEMA, used to determine the base flood, other frequency floods, flood elevations, floodway information and boundaries, and flood profiles.
Letters of map change (LOMC) means an official FEMA determination, by letter, that amends or revises an effective FIRM or FIS. Letters of map change include:
(1) Letter of map amendment (LOMA). An amendment based on technical data showing that a property was incorrectly included in a designated special flood hazard area. A LOMA amends the current effective FIRM and establishes that a land as defined by metes and bounds, or structure is not located in a special flood hazard area.
(2) Letter of map revision (LOMR). A revision based on technical data that may show changes to flood zones, flood elevations, floodplain and floodway delineations, and planimetric features. A letter of map revision based on fill (LOMR-F) is a determination that a structure or parcel of land has been elevated by fill above the base flood elevation and is, therefore, no longer exposed to flooding associated with the base flood. To qualify for this determination, the fill must have been permitted and placed in accordance with the community's floodplain management regulations.
(3) Conditional letter of map revision (CLOMR). A formal review and comment as to whether a proposed flood protection project or other project complies with the minimum NFIP requirements for such projects with respect to delineation of special flood hazard areas. A CLOMR does not revise the effective FIRM or FIS.
Lowest adjacent grade means the lowest natural elevation of the ground surface next to the walls of a structure.
Lowest floor means the floor of the lowest enclosed area, including basement, but excluding any unfinished or flood-resistant enclosure, usable solely for vehicle parking, building access, or limited storage provided that such enclosure is not built to render the structure in violation of the applicable non-elevation design requirements of 44 CFR 60.3.
Manufactured home means a structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when connected to the required utilities. For floodplain management purposes the term "manufactured home" also includes park trailers, travel trailers, and other similar vehicles placed on a site for greater than 180 consecutive days.
Manufactured home park or subdivision means a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.
New construction, for the purposes of determining insurance rates, means structures for which the "start of construction" commenced on or after February 2, 1989, and includes any subsequent improvements to such structures. For floodplain management or development purposes, new construction means structures for which the start of construction commenced on or after the effective date of a floodplain management regulation adopted by the city and includes any subsequent improvements to such structures.
Post-FIRM structures means a structure for which construction or substantial improvement occurred on or after February 2, 1989.
Pre-FIRM structures means a structure for which construction or substantial improvement occurred on or before February 2, 1989.
Recreational vehicle means a vehicle which is:
(1) Built on a single chassis;
(2) Four hundred square feet or less when measured at the largest horizontal projection;
(3) Designed to be self-propelled or towable; and
(4) Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational camping, travel, or seasonal use.
Repetitive loss structure means a building covered by a contract for flood insurance that has incurred flood-related damages on two occasions in a ten-year period, in which the cost of the repair, on the average, equaled or exceeded 25 percent of the market value of the structure at the time of each such flood event; and at the time of the second incidence of flood-related damage, the contract for flood insurance contains increased cost of compliance coverage.
Severe repetitive loss structure means a structure that:
(1) Is covered under a contract for flood insurance made available under the NFIP; and
(2) Has incurred flood related damage:
a. For which four or more separate claims payments have been made under flood insurance coverage with the amount of each such claim exceeding $5,000.00, and with the cumulative amount of such claims payments exceeding $20,000.00; or
b. For which at least two separate claims payments have been made under such coverage, with the cumulative amount of such claims exceeding the market value of the insured structure.
Shallow flooding area means a special flood hazard area with base flood depths from one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.
Special flood hazard area (SFHA) means the land in the floodplain subject to a one percent or greater chance of being flooded in any given year as determined in section 90-316 of article V.
Start of construction means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement, substantial improvement, or other improvement was within 180 days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading, and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms. For a substantial improvement, the actual start of the construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
Structure, for floodplain management purposes, means a walled and roofed building, including a gas or liquid storage tank, that is principally above ground, as well as a manufactured home.
Substantial damage means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred.
Substantial improvement means any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds 50 percent of the market value of the structure before the "start of construction" of the improvement. This includes structures which have incurred "substantial damage," regardless of the actual repair work performed. The term does not, however, include either:
(1) Any project for improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications which have been identified by the local code enforcement official and which are the minimum necessary to assure safe living conditions; or
(2) Any alteration of a "historic structure," provided that the alteration will not preclude the structure's continued designation as a "historic structure."
Variance means a grant of relief by the community from the terms of a floodplain management regulation.
Violation means the failure of a structure or other development to be fully compliant with the community's floodplain management regulations. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in this division is presumed to be in violation until such time as that documentation is provided.
Water surface elevation means the height, in relation to the North American Vertical Datum (NAVD) of 1988 (or other datum specified), of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.
Sec. 90-302. - Authority.#
The provisions of this division are adopted pursuant to the authority granted to the city by the Code of Virginia, section 15.2-2283, et seq., and the National Flood Insurance Program regulations set forth in 44 CFR 60-80.
Sec. 90-303. - Applicability.#
(a) This division shall apply to all areas of special flood hazard within the jurisdiction of the city.
(b) The areas of special flood hazard identified by the Federal Emergency Management Agency (FEMA) in the current Flood Insurance Study (FIS) and Flood Insurance Rate Map (FIRM) for the city, dated September 29, 2017, and any subsequent revisions or amendments thereto, are adopted by reference and declared to be a part of this division.
(c) The Flood Insurance Study and/or Flood Insurance Rate Map are on file at the city offices.
Sec. 90-304. - Compliance and liability.#
(a) No structure or land shall hereafter be located, extended, converted, or structurally altered without full compliance with the terms of this division and other applicable regulations.
(b) The degree of flood protection required by this division is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur on rare occasions. Flood heights may be increased by man-made or natural causes. This division does not imply that land outside the areas of special flood hazards or uses permitted within such areas will be free from flooding or flood damages. This division shall not create liability on the part of the city, any officer or employee thereof, or the Federal Emergency Management Agency, for any flood damages that result from reliance on this division or any administrative decision lawfully made thereunder.
Sec. 90-305. - Abrogation and greater restrictions.#
This division is not intended to repeal, abrogate, or impair any existing easements, covenants, or deed restrictions. However, where this division and another ordinance, easement, covenant, or deed restriction conflict or overlap, whichever imposes the more stringent restrictions shall prevail.
Sec. 90-306. - Penalty for violations.#
Violations of the provisions of this division or failure to comply with any of its requirements, including violations of conditions and safeguards established in connection with grants of variance or special exceptions, shall constitute a misdemeanor. Any person responsible for a violation shall comply with the notice of violation and stop work order provisions of section 90-319. Nothing herein contained shall prevent the city from taking such other lawful action as is necessary to prevent or remedy any violation.
Sec. 90-307. - Designation of the administrator.#
The zoning administrator is hereby appointed to administer and implement the provisions of this division and is referred to herein as the floodplain administrator.
Sec. 90-308. - Duties and responsibilities of the administrator.#
Duties and responsibilities of the floodplain administrator shall include, but not be limited to, the following:
(1) Permit review. Review all development permits to determine that:
a. The permit requirements of this division have been satisfied;
b. All other required state and federal permits have been obtained;
c. The site is reasonably safe from flooding;
d. The proposed development does not adversely affect the carrying capacity of zones where base flood elevations have been determined but a floodway has not been designated. For purposes of this division, "adversely affects" means that the cumulative effect of the proposed development when combined with all other existing and anticipated development will not increase the water surface elevation of the base flood more than one foot at any point;
e. The proposed development is consistent with the need to minimize flood damage;
f. The proposed development is consistent with the requirements of this division and all other applicable codes and ordinances; and
g. All necessary permits have been obtained from those governmental agencies from which approval is required by federal or state law, including section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334.
(2) Development of substantial improvement and substantial damage procedures.
a. Establish procedures for administering and documenting determinations of substantial improvement and substantial damage made pursuant to section 90-322.
b. Require that all substantial improvement and substantial damage determinations be based on the documented cost of the proposed improvement or repair and the documented market value of the structure before the improvement or repair is started.
c. Require the permit applicant to submit a cost estimate prepared by a qualified professional, such as a contractor, architect, or engineer, itemizing the cost of the proposed improvement or repair. The cost of the improvement or repair shall be determined using the actual cash value of the items, not the retail or replacement value.
d. Require the permit applicant to submit documentation of the market value of the structure prior to the start of construction or the damage event. The market value shall be determined by a qualified professional, such as an appraiser, or by using the most recent tax assessment value adjusted to reflect current market conditions.
(3) Review of subdivision and other proposed new development. Review all subdivision proposals and other proposed new development, including manufactured home parks or subdivisions, to determine whether such proposals will be reasonably safe from flooding. If a proposed subdivision or other proposed new development is located in a special flood hazard area, the proposal shall be reviewed to assure that:
a. All such proposals are consistent with the need to minimize flood damage within the flood-prone area;
b. All public utilities and facilities, such as sewer, gas, electrical, and water systems are located and constructed to minimize or eliminate flood damage;
c. Adequate drainage is provided to reduce exposure to flood hazards; and
d. Base flood elevation data are provided for subdivision proposals and other proposed new development, including manufactured home parks and subdivisions, which are greater than either 50 lots or five acres.
(4) Review of existing and proposed development. Review all existing and proposed development within the special flood hazard area to ensure that:
a. All necessary permits have been obtained from those governmental agencies from which approval is required by federal or state law;
b. The proposed development is consistent with the need to minimize flood damage;
c. The proposed development is consistent with the requirements of this division and all other applicable codes and ordinances; and
d. The proposed development will not result in unsafe flooding conditions.
(5) Alteration of watercourses.
a. Notification of adjacent communities. The floodplain administrator shall notify, in riverine situations, adjacent communities and the state coordinating agency prior to any alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Emergency Management Agency.
b. Maintenance. The floodplain administrator shall require that maintenance is provided within the altered or relocated portion of said watercourse so that the flood-carrying capacity is not diminished.
c. Certification. The floodplain administrator shall obtain certification from a registered professional engineer that the flood-carrying capacity of an altered or relocated watercourse is not diminished.
(6) Interpretation of FIRM boundaries. The floodplain administrator shall make interpretations, where needed, as to the exact location of the boundaries of the areas of special flood hazard. Where there appears to be a conflict between a mapped boundary and actual field conditions, the floodplain administrator shall make the necessary interpretation. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this division.
(7) Use of other base flood data. When base flood elevation data has not been provided in accordance with section 90-316, the floodplain administrator shall obtain, review, and reasonably utilize any base flood elevation data available from a federal, state, or other source, in order to administer the provisions of this division.
(8) Information to be obtained and maintained.
a. Obtain and record the actual elevation (in relation to mean sea level) of the lowest habitable floor, including basement, of all new or substantially improved structures, and whether or not the structure contains a basement.
b. For all new or substantially improved floodproofed structures:
-
Verify and record the actual elevation (in relation to mean sea level) to which the structure has been floodproofed; and
-
Maintain the floodproofing certifications required in this division.
c. Maintain for public inspection all records pertaining to the provisions of this division, including the actual elevations of the lowest habitable floor and the lowest floor of all new or substantially improved structures, and all floodproofing certificates, letters of map amendment, letters of map revision, and variances.
d. Maintain a record of all variance actions, including justification for their issuance, and notify any applicant to whom a variance is granted that the issuance of a variance to construct a structure below the base flood elevation will result in increased premium rates for flood insurance and increases risks to life and property.
(9) Duties and responsibilities of the board of zoning appeals. The board of zoning appeals shall hear and decide appeals when it is alleged there is an error in any requirement, decision, or determination made by the floodplain administrator in the enforcement and administration of this division.
Sec. 90-309. - Records.#
The floodplain administrator shall maintain a record of all activities required by this division, including but not limited to:
(1) All permits issued for development in special flood hazard areas;
(2) Elevation certificates for all new and substantially improved structures;
(3) Floodproofing certificates for all new and substantially improved floodproofed structures;
(4) Certifications of design standards for all new and substantially improved structures;
(5) Notifications to adjacent communities and the state coordinating agency prior to any alteration or relocation of a watercourse;
(6) Documentation of the maintenance of altered or relocated watercourses;
(7) All variance actions, including justification for their issuance; and
(8) All appeals and decisions related to the administration of this division.
Sec. 90-310. - Use and interpretation of FIRMs.#
(a) The floodplain administrator shall use the latest issued Flood Insurance Rate Map (FIRM) and Flood Insurance Study (FIS) in the administration of this division.
(b) The floodplain administrator shall interpret the boundaries of the special flood hazard areas shown on the FIRM. Where map boundaries appear to conflict with actual field conditions, the floodplain administrator may request a letter of map amendment (LOMA) or letter of map revision (LOMR) from FEMA.
(c) The floodplain administrator shall review proposed developments to assure that all necessary permits have been received from those governmental agencies from which approval is required by federal or state law, including section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334.
Sec. 90-311. - Jurisdictional boundary changes.#
If the jurisdictional boundaries of the city are changed, the floodplain administrator shall:
(1) Notify the Federal Emergency Management Agency (FEMA) and the state coordinating agency of any jurisdictional boundary changes;
(2) Submit to FEMA within six months of the jurisdictional boundary change, a letter of map revision (LOMR) showing the revised boundaries; and
(3) Work with FEMA to ensure that the FIRM and FIS are updated to reflect the jurisdictional boundary changes.
Sec. 90-312. - District boundary changes.#
The city council may, from time to time, amend the boundaries of the flood hazard overlay district upon the recommendation of the planning commission. Proposed amendments shall be submitted to the Federal Emergency Management Agency (FEMA) for review and approval prior to adoption. The floodplain administrator shall submit all proposed amendments to FEMA for a conditional letter of map revision (CLOMR) or letter of map revision (LOMR) as appropriate.
Sec. 90-313. - Interpretation of district boundaries.#
The floodplain administrator shall make interpretations, where needed, as to the exact location of the boundaries of the special flood hazard areas. Any person contesting the location of a boundary shall be given a reasonable opportunity to appeal the interpretation to the board of zoning appeals as provided in this division.
Sec. 90-314. - Submitting technical data.#
(a) The floodplain administrator may require the applicant to submit technical data to support a request for a letter of map amendment (LOMA) or letter of map revision (LOMR) from FEMA.
(b) The floodplain administrator shall require that all technical data submitted to FEMA for letters of map amendment or revision be prepared by a licensed professional engineer or land surveyor in accordance with standard engineering practices.
(c) The floodplain administrator shall submit to FEMA any technical data that is needed to update the Flood Insurance Study (FIS) and Flood Insurance Rate Map (FIRM).
Sec. 90-315. - Letters of map revision.#
(a) The floodplain administrator may request, in writing, that the Federal Emergency Management Agency (FEMA) issue a letter of map revision (LOMR) when:
(1) The city has obtained more detailed topographic or hydrologic data;
(2) A watercourse has been altered or relocated;
(3) Fill has been placed in the special flood hazard area; or
(4) Other changes have occurred that affect the base flood elevations or special flood hazard area boundaries.
(b) The floodplain administrator shall require the applicant to reimburse the city for any costs incurred in processing a request for a letter of map revision.
Sec. 90-316. - Establishment of flood hazard zones.#
The special flood hazard areas are hereby established and are shown on the Flood Insurance Rate Map (FIRM) and Flood Insurance Study (FIS) for the city, dated September 29, 2017, and any subsequent revisions or amendments thereto. The special flood hazard areas include the following zones:
(1) Zone A - Areas subject to inundation by the one percent annual chance flood event, determined using approximate methodologies. Base flood elevations are not determined.
(2) Zone AE - Areas subject to inundation by the one percent annual chance flood event, determined using detailed methodologies. Base flood elevations are shown.
(3) Zone AH - Areas subject to shallow flooding (one to three feet of water) with base flood elevations shown.
(4) Zone AO - Areas subject to shallow flooding (one to three feet of water) with flood depths shown.
(5) Zone A99 - Areas subject to inundation by the one percent annual chance flood event, but which will ultimately be protected upon completion of an under-construction federal flood protection system.
(6) Zone VE - Areas subject to inundation by the one percent annual chance flood event with velocity hazard (wave action). Base flood elevations are shown.
Sec. 90-317. - Permitted uses in flood hazard zones.#
The following uses are permitted in the flood hazard overlay district, provided they are in compliance with the provisions of this division and all other applicable provisions of this ordinance:
(1) Agriculture, horticulture, and silviculture uses, including the operation of farm machinery and equipment, provided that no structures are erected and no fill is placed;
(2) Open space uses, including parks, recreational areas, and wildlife preserves;
(3) Lawns, gardens, and parking areas;
(4) Loading areas, docks, and piers;
(5) Utility lines and facilities, including electric, gas, telephone, water, and sewer lines, provided they are designed and constructed to minimize flood damage;
(6) Other uses similar in nature to the above, provided they are not prohibited by this division or any other provision of this ordinance.
Sec. 90-318. - Development in flood hazard zones.#
(a) All development in special flood hazard areas shall:
(1) Be adequately anchored to prevent flotation, collapse, or lateral movement of the structure;
(2) Be constructed with materials resistant to flood damage;
(3) Be constructed by methods and practices that minimize flood damage;
(4) Be constructed with electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding;
(5) Not adversely affect the carrying capacity of the floodway or the base flood elevation;
(6) Not increase the potential for erosion or sedimentation;
(7) Not create a nuisance or hazard to adjacent properties; and
(8) Comply with all applicable federal, state, and local laws and regulations.
(b) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the systems.
(c) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters.
(d) On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding.
(e) All subdivision proposals and other proposed new development shall be consistent with the need to minimize flood damage and shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize or eliminate flood damage.
(f) Adequate drainage shall be provided to reduce exposure to flood hazards.
(g) Base flood elevation data shall be provided for subdivision proposals and other proposed new development which are greater than either 50 lots or five acres.§
Sec. 90-319. - Permits and applications.#
(a) No person shall engage in any development in a special flood hazard area without first obtaining a permit from the floodplain administrator.
(b) Applications for permits shall be made on forms provided by the floodplain administrator and shall include:
(1) The name and address of the applicant;
(2) The location of the property;
(3) A description of the proposed development;
(4) A site plan showing the location of the proposed development, the boundaries of the special flood hazard area, and the base flood elevation;
(5) The elevation of the lowest floor, including basement, of all proposed structures;
(6) The elevation to which any proposed structure will be floodproofed;
(7) Certification by a registered professional engineer or architect that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions of this division;
(8) A description of the extent to which any watercourse will be altered or relocated as a result of the proposed development; and
(9) Such other information as the floodplain administrator may reasonably require.
(c) The floodplain administrator shall review all permit applications to determine whether the proposed development is located in a special flood hazard area. If the proposed development is located in a special flood hazard area, the floodplain administrator shall:
(1) Review the application to determine whether the proposed development is consistent with the need to minimize flood damage;
(2) Review the application to determine whether all necessary permits have been obtained from those governmental agencies from which approval is required by federal or state law;
(3) Review the application to determine whether the proposed development will adversely affect the carrying capacity of the floodway; and
(4) Review the application to determine whether the proposed development is reasonably safe from flooding.
(d) If a proposed development is located in a special flood hazard area and would involve the alteration or relocation of a watercourse, the floodplain administrator shall:
(1) Notify adjacent communities and the state coordinating agency prior to any alteration or relocation of a watercourse;
(2) Submit evidence of such notification to the Federal Emergency Management Agency; and
(3) Require that maintenance is provided within the altered or relocated portion of said watercourse so that the flood-carrying capacity is not diminished.
(e) The floodplain administrator shall maintain a record of all permit applications and permits issued pursuant to this division.
Sec. 90-320. - Elevation and construction standards.#
(a) Residential structures. New construction and substantial improvement of any residential structure shall have the lowest floor, including basement, elevated to or above the base flood elevation.§
(b) Nonresidential structures. New construction and substantial improvement of any nonresidential structure shall either have the lowest floor, including basement, elevated to or above the base flood elevation, or, together with attendant utility and sanitary facilities, shall:
(1) Be floodproofed so that below the base flood elevation the structure is watertight with walls substantially impermeable to the passage of water;
(2) Have structural components capable of resisting hydrostatic and hydrodynamic loads and effects of buoyancy; and
(3) Be certified by a registered professional engineer or architect that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions of this subsection. Such certification shall be provided to the floodplain administrator.
(c) Manufactured homes. New or replacement manufactured homes and substantial improvement of existing manufactured homes shall:
(1) Be elevated on a permanent foundation so that the lowest floor of the manufactured home is at or above the base flood elevation; and
(2) Be securely anchored to an adequately anchored foundation system to resist flotation, collapse, and lateral movement.§ Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors.
(d) Recreational vehicles. Recreational vehicles placed on sites within special flood hazard areas shall either:
(1) Be on the site for fewer than 180 consecutive days; or
(2) Be fully licensed and ready for highway use, on wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and have no permanently attached additions; or
(3) Meet the requirements for manufactured homes in subsection (c) above.
(e) Enclosures below the lowest floor. New construction and substantial improvement of any structure with an enclosure below the lowest floor shall:
(1) Be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this requirement must either be certified by a registered professional engineer or architect or meet or exceed the following minimum criteria:
a. A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided;
b. The bottom of all openings shall be no higher than one foot above grade; and
c. Openings may be equipped with screens, louvers, valves, or other coverings or devices provided that they permit the automatic entry and exit of floodwaters.
(2) Be used only for parking of vehicles, building access, or storage.
(f) Fill. Fill placed in special flood hazard areas shall:
(1) Be composed of clean earthen material;
(2) Be compacted to a density equal to or greater than the surrounding natural ground;
(3) Be sloped at a grade of no steeper than two horizontal to one vertical; and
(4) Be protected against erosion by vegetative cover or other means.§
(g) Standards for subdivision proposals.
(1) All subdivision proposals shall be consistent with the need to minimize flood damage;
(2) All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize or eliminate flood damage;
(3) All subdivision proposals shall have adequate drainage provided to reduce exposure to flood hazards; and
(4) Base flood elevation data shall be provided for subdivision proposals and other proposed new development which are greater than either 50 lots or five acres.
Sec. 90-321. - Design criteria for utilities and facilities.#
(a) Sanitary sewer facilities. All new or replacement sanitary sewer facilities and private package sewage treatment plants, including all pumping stations and collector systems, shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into the flood waters. In addition, they should be located and constructed to minimize or eliminate flood damage and impairment.
(b) Water facilities. All new or replacement water facilities shall be designed to minimize or eliminate infiltration of flood waters into the system and be located and constructed to minimize or eliminate flood damages.
(c) Drainage facilities. All storm drainage facilities shall be designed to convey the flow of surface waters without damage to persons or property. The systems shall ensure drainage away from buildings and on-site waste disposal systems. The city council may require a primarily underground system to accommodate frequent floods and a secondary surface system to accommodate larger, less frequent floods. Drainage plans shall be consistent with local and regional drainage plans. The facilities shall be designed to prevent the discharge of excess runoff onto adjacent properties.
(d) Utilities. All utilities, such as gas lines, electrical and telephone systems being placed in flood-prone areas should be located, elevated where possible, and constructed to minimize the chance of impairment during a flooding occurrence. Electrical, heating, ventilation, plumbing, air conditioning equipment, and other service facilities, including duct work, shall be designed and placed to prevent water from entering or accumulating within the components during conditions of flooding.
(e) Streets and sidewalks. Streets and sidewalks should be designed to minimize their potential for increasing and aggravating the levels of flood flow. Drainage openings shall be required to sufficiently discharge flood flows without unduly increasing flood heights.
Sec. 90-322. - Existing structures in floodplain areas.#
Any structure or use of a structure or premises must be brought into conformity with these provisions when it is changed, repaired, or improved unless one of the following exceptions is established before the change is made:
(1) The administrator has determined that:
a. Change is not a substantial repair or substantial improvement;
b. No new square footage is being built in the floodplain that is not compliant;
c. No new square footage is being built in the floodway;
d. The change complies with this ordinance and the VA USBC; and
e. The change, when added to all the changes made during a rolling five-year period does not constitute 50 percent of the structure's value.§
(2) The changes are required to comply with a citation for a health or safety violation.
(3) The structure is a historic structure and the change required would impair the historic nature of the structure.
Sec. 90-323. - Variances.#
(a) General.
(1) A request for a variance to the requirements of this flood hazard overlay district may be made in accordance with article III, permits and applications, of this ordinance.
(2) The board of zoning appeals may refer any application and accompanying documentation pertaining to any request for a variance to any engineer or other qualified person or agency for technical assistance in evaluating the proposed project in relation to flood heights and velocities, and the adequacy of the plans for flood protection and other related matters.
(b) Limitations.
(1) While the granting of variances generally is limited to a lot size less than one-half acre, deviations from that limitation may occur.§ However, as the lot size increases beyond one-half acre, the technical justification required for issuing a variance increases.
(2) No variance shall be granted for an accessory structure exceeding 200 square feet.§
(c) Basis for variances. Variances shall be issued only:
(1) Upon a showing of good and sufficient cause;
(2) After the board of zoning appeals has determined that failure to grant the variance would result in exceptional hardship to the applicant; and
(3) After the board of zoning appeals has determined that the granting of such variance will not result in a(n):
a. Unacceptable or prohibited increase(es) in flood heights;
b. Additional threats to public safety;
c. Extraordinary public expense;
d. Creation of nuisances;
e. Cause for fraud or victimization of the public; and/or
f. A conflict with local laws or ordinances.
(d) Additional factors. In passing upon applications for variances, the board of zoning appeals shall satisfy all relevant factors and procedures specified in article III, permits and applications, of this ordinance, and consider the following additional factors:
(1) The danger to life and property due to increased flood heights or velocities caused by encroachments. No variance shall be granted for any proposed use, development, or activity within any floodway district that will cause any increase in the one percent chance flood elevation;
(2) The danger that materials may be swept on to other lands or downstream to the injury of others;
(3) The proposed water supply and sanitation systems and the ability of these systems to prevent disease, contamination, and unsanitary conditions;
(4) The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owners;
(5) The importance of the services provided by the proposed facility to the community;
(6) The requirements of the facility for a waterfront location;
(7) The availability of alternative locations not subject to flooding for the proposed use;
(8) The compatibility of the proposed use with existing development and development anticipated in the foreseeable future;
(9) The relationship of the proposed use to the comprehensive plan and this division;
(10) The safety of access by ordinary and emergency vehicles to the property in time of flood;
(11) The expected heights, velocity, duration, rate of rise, and sediment transport of the flood waters expected at the site; and
(12) The historic nature of a structure.
a. Variances for repair or rehabilitation of historic structures may be granted upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum necessary to preserve the historic character and design of the structure; and
(13) Such other factors which are relevant to the purposes of this ordinance.
(e) Notification and record.
(1) The BZA shall notify the applicant for a variance, in writing, that the issuance of a variance to construct a structure below the base flood elevation will:
a. Increase the risks of life and property; and
b. Will result in increased premium rates for flood insurance.
(2) A record shall be maintained of the above notification as well as all variance actions, including justification for the issuance of the variances. Any variances which are issued shall be noted in the annual or biennial report submitted to the Federal Emergency Management Agency (FEMA).
Sec. 90-301. - Definitions.#
Substantial damage means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred.
Substantial improvement means any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds 50 percent of the market value of the structure before the start of construction of the improvement. This term includes structures which have incurred substantial damage regardless of the actual repair work performed. The term does not, however, include either:
(1) Any project for improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications which have been identified by the local code enforcement official and which are the minimum necessary to assure safe living conditions; or
(2) Any alteration of a historic structure, provided that the alteration will not preclude the structure's continued designation as a historic structure.
Violation means the failure of a structure or other development to be fully compliant with the city's floodplain management regulations in this division. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in section 60.3(d)(3) of the National Flood Insurance Program regulations, is presumed to be in violation until such time as that documentation is provided.
Watercourse means a lake, river, creek, stream, wash, channel, or other topographic feature on or over which waters flow at least periodically. Watercourse includes specifically designated areas in which substantial flood damage may occur.
Zone, A means those areas for which no detailed flood profiles or elevations are provided, but the one percent annual chance floodplain boundary has been approximated.
Zone, AE means a flood hazard zone with two categories defined below as:
(1) Category 1 areas shall be those areas for which one percent annual chance flood elevations have been provided and the floodway has been delineated.
(2) Category 2 areas on the FIRM accompanying the FIS shall be those areas for which one percent annual chance flood elevations have been provided and the floodway has not been delineated.
Zone, X means those areas of two-tenths percent annual chance flood or areas of one percent annual chance flood with average depths of less than one foot or with drainage areas less than one square mile.
Sec. 90-302. - Authority.#
This division is adopted pursuant to the authority granted to localities by Code of Virginia, § 15.2-2280, as amended, and may be referred to as the city flood hazard overlay district, flood hazard overlay, floodplain overlay, or floodplain regulations.
Sec. 90-303. - Applicability.#
These provisions shall apply to all lands within the jurisdiction of the city and identified as special flood hazard areas (SFHAs) identified by the city or shown on the flood insurance rate map (FIRM) or included in the flood insurance study (FIS) that are provided to the city by the Federal Emergency Management Agency (FEMA).
Sec. 90-304. - Compliance and liability.#
(a) No land shall hereafter be developed, and no structure shall be located, relocated, constructed, reconstructed, enlarged, or structurally altered except in full compliance with the terms and provisions of this division, and any other applicable ordinances and regulations which apply to uses within the jurisdiction of this ordinance.
(b) The degree of flood protection sought by the provisions of this division is considered reasonable for regulatory purposes and is based on acceptable engineering methods of study. Larger floods may occur on rare occasions. Flood heights may be increased by man-made or natural causes, such as ice jams and bridge openings restricted by debris. This division does not imply that areas outside the floodplain area or that land uses permitted within such area will be free from flooding or flood damages.
(c) This division shall not create liability on the part of the city or any officer or employee thereof for any flood damages that result from reliance on this division, or any administrative decision lawfully made there under.
Sec. 90-305. - Abrogation and greater restrictions.#
(a) This division supersedes any locally adopted flooding regulations currently in effect in flood-prone districts. Any regulations, however, shall remain in full force and effect to the extent that its provisions are more restrictive.
(b) These regulations are not intended to repeal or abrogate any existing ordinances including zoning and/or subdivision ordinances or building codes. In the event of a conflict between these regulations and any other ordinance, the more restrictive shall govern.
Sec. 90-306. - Penalty for violations.#
(a) Any person who fails to comply with any of the requirements or provisions of this division, or directions of the administrator, or any other authorized employee of the city, shall be subject to the penalties pursuant to the Code of Virginia, and as outlined in the VA Uniform Statewide Building Code (USBC) for building code violations, and article II, division 4, enforcement, of this ordinance for violations and associated penalties.
(b) In addition to the above penalties, all other actions are hereby reserved, including an action in equity for the proper enforcement of this division.
(c) The imposition of a fine or penalty for any violation of, or noncompliance with, this division shall not excuse the violation or noncompliance or permit it to continue; and all such persons shall be required to correct or remedy such violations within a reasonable time.
(d) Any structure constructed, reconstructed, enlarged, altered, or relocated in noncompliance with this division may be declared by the city to be a public nuisance and abatable as such.
(e) Flood insurance may be withheld from structures constructed in violation of this division.
Sec. 90-307. - Designation of the administrator.#
The city shall appoint a designee to administer and implement the regulations of this division, referred to herein as the administrator. The administrator may:
(1) Administer the duties and responsibilities herein.
(2) Delegate duties and responsibilities set forth in these regulations to qualified technical personnel, plan examiners, inspectors, and other employees.
(3) Enter into a written agreement or written contract with another community or private sector entity to administer specific provisions of these regulations. Administration of any part of these regulations by another entity shall not relieve the community of its responsibilities pursuant to the participation requirements of the National Flood Insurance Program as set forth in the Code of Federal Regulations at 44 CFR 59.22.
Sec. 90-308. - Duties and responsibilities of the administrator.#
The duties and responsibilities of the administrator shall include but are not limited to:
(1) Review applications for permits to determine whether proposed activities will be located in a SFHA.
(2) Interpret floodplain boundaries and provide available base flood elevation and flood hazard information.
(3) Review applications to determine whether proposed activities will be reasonably safe from flooding and require new construction and substantial improvements to meet the requirements of these regulations.
(4) Review applications to determine whether all necessary permits have been obtained from the federal, state, or local agencies from which prior or concurrent approval is required; in particular, permits from state agencies for any construction, reconstruction, repair, or alteration of a dam, reservoir, or waterway obstruction (including bridges, culverts, structures), any alteration of a watercourse, or any change of the course, current, or cross section of a stream or body of water, including any change to the 100-year frequency floodplain of free flowing non-tidal waters of the state.
(5) Verify that an applicant proposing to alter a watercourse has notified adjacent local governments, the Department of Conservation and Recreation Division of Dam Safety and Floodplain Management (DCR), the Virginia Department of Environmental Quality (DEQ) and the US Army Corp of Engineers (USACE) and has submitted copies of such notifications to FEMA.
(6) Approve applications and issue permits to develop in SFHA if the provisions of this division have been met or disapprove applications if the provisions of this division have not been met.
(7) Inspect, or cause to be inspected, prospective buildings, structures, and other prospective development for which permits have been issued to determine compliance with this division or to determine if noncompliance has occurred or violations have been committed.
(8) Review elevation certificates and require incomplete or deficient certificates to be corrected.
(9) Submit to FEMA, or require to be submitted to FEMA, at the applicant's expense, data, and information necessary to maintain FIRMs, including hydrologic and hydraulic engineering analyses prepared by or for the city, within six months after such data and information becomes available if the analysis indicates changes in base flood elevations.
(10) Maintain and permanently keep records that are necessary for the administration of these regulations, including:
a. Copies of FISs, FIRMS (including historic studies and maps and current effective studies and maps), and letters of map change (LOMC); and
b. Documentation supporting issuance and denial of permits, elevation certificates, documentation of the elevation (in relation to the datum on the FIRM) to which structures have been floodproofed, other required design certifications, variances, and records of enforcement actions taken to correct violations of these regulations.
(11) Enforce the provisions of these regulations, investigate violations, issue notices of violation, and require permit holders to take corrective action.
(12) Advise the board of zoning appeals regarding the intent of these regulations and, for each application for a variance, prepare a staff report and recommendation.
(13) Administer the requirements related to proposed work on existing buildings:
a. Make determinations as to whether buildings and structures that are in SFHA that are damaged by any cause have been substantially damaged.
b. Make reasonable efforts to notify owners of substantially damaged structures of the need to obtain a permit to repair, rehabilitate, or reconstruct the structure. Prohibit the repair of a substantially damaged building without a permit, except for temporary emergency protective measures necessary to secure a property or to stabilize a building or structure to prevent additional damage.
(14) Undertake, as determined appropriate by the administrator due to the circumstances, other actions, which may include but are not limited to: issuing press releases, public service announcements, and other public information materials related to permit requests and repair of damaged structures; coordinating with other federal, state, and local agencies to assist with substantial damage determinations; providing owners of damaged structures information related to the proper repair of damaged structures in SFHAs and assisting property owners with documentation necessary to file claims for increased cost of compliance coverage under National Flood Insurance Program (NFIP) flood insurance policies.
(15) Notify FEMA when the corporate boundaries of the city have been modified and:
a. Provide a map that clearly delineates the new corporate boundaries or the new area for which the authority to regulate pursuant to these regulations has either been assumed or relinquished through annexation; and
b. If the FIRM for any annexed area includes special flood hazard areas that have flood zones that have regulatory requirements that are not set forth in these regulations, prepare amendments to these regulations to adopt the FIRM and appropriate requirements, and submit the amendments to the governing body for adoption; such adoption shall take place at the same time as or prior to the date of annexation and a copy of the amended regulations shall be provided to DCR and FEMA.
(16) Upon the request of FEMA, complete and submit a report concerning participation in the NFIP, which may request information regarding the number of buildings in the SFHA, number of permits issued for development in the SFHA, and number of variances issued for development in the SFHA.
(17) It is the duty of the administrator to consider flood, mudslide, and flood-related erosion hazards, to the extent that they are known, in all official actions relating to land management and use throughout the entire jurisdictional area of the city, whether or not those hazards have been specifically delineated geographically (e.g. via mapping or surveying).
Sec. 90-309. - Records.#
Records of actions associated with administering this division shall be kept on file and maintained by the administrator or their designee.
Sec. 90-310. - Use and interpretation of FIRMs.#
The administrator shall make interpretations, where needed, as to the exact location of SFHA, floodplain boundaries, and floodway boundaries. The following shall apply to the use and interpretation of FIRMs and data:
(1) Where field surveyed topography indicates that adjacent ground elevations:
a. Are below the base flood elevation in riverine SFHAs, even in areas not delineated as a SFHA on a FIRM, the area shall be considered as a SFHA and subject to the requirements of these regulations; or
b. Are above the base flood elevation, the area shall be regulated as a SFHA unless the applicant obtains a LOMC that removes the area from the SFHA.
(2) In FEMA-identified SFHAs where base flood elevation and floodway data have not been identified and in areas where FEMA has not identified SFHAs, any other flood hazard data available from a federal, state, or other source shall be reviewed and reasonably used.
(3) Base flood elevations and designated floodway boundaries on FIRMs and in FISs shall take precedence over base flood elevations and floodway boundaries by any other sources if such sources show reduced floodway widths and/or lower base flood elevations.
(4) Other sources of data shall be reasonably used if such sources show increased base flood elevations and/or larger floodway areas than are shown on FIRMs and in FISs.
(5) If a preliminary FIRM and/or a preliminary FIS has been provided by FEMA:
a. Upon the issuance of a letter of final determination (LOFD) by FEMA, the preliminary flood hazard data shall be used and shall replace the flood hazard data previously provided from FEMA for the purposes of administering these regulations.
b. Prior to the issuance of a LOFD by FEMA, the use of preliminary flood hazard data shall be deemed the best available data pursuant to section 90-316 as defined by this division and used where no base flood elevations and/or floodway areas are provided on the effective FIRM.
c. Prior to issuance of a LOFD by FEMA, the use of preliminary flood hazard data is permitted where the preliminary base flood elevations or floodway areas exceed the base flood elevations and/or designated floodway widths in existing flood hazard data provided by FEMA. Such preliminary data may be subject to change and/or appeal to FEMA.
ARTICLE III. — FLOOD HAZARD OVERLAY DISTRICT (CONTINUED)#
Sec. 90-311. - Jurisdictional boundary changes.#
(a) The county flood hazard overlay in effect on the date of annexation shall remain in effect and shall be enforced by the municipality for all annexed areas until the municipality adopts and enforces an ordinance which meets the requirements for participation in the NFIP. The city shall pass a resolution acknowledging and accepting responsibility for enforcing floodplain ordinance standards prior to annexation of any area containing identified flood hazards. If the FIRM for any annexed area includes SFHAs with flood zones that have regulatory requirements that are not set forth in these regulations, the governing body shall prepare amendments to these regulations to adopt the FIRM and appropriate requirements, and submit the amendments to the governing body for adoption; such adoption shall take place at the same time as or prior to the date of annexation and a copy of the amended regulations shall be provided to DCR Division of Dam Safety and Floodplain Management and FEMA.
(b) In accordance with the Code of Federal Regulations, title 44, subpart (B), section 59.22(a)(9)(v), all NFIP participating communities must notify the Federal Insurance Administration and optionally the state coordinating office in writing whenever the boundaries of the community have been modified by annexation or the community has otherwise assumed or no longer has authority to adopt and enforce floodplain management regulations for a particular area.
(c) To ensure that all FIRMs accurately represent the community's boundaries, a copy of a map of the community suitable for reproduction, clearly delineating the new corporate limits or new area for which the community has assumed, or relinquished floodplain management regulatory authority must be included with the notification.
Sec. 90-312. - District boundary changes.#
The delineation of the flood hazard overlay district may be revised by the city council where natural or man-made changes have occurred and/or where more detailed studies have been conducted or undertaken by the U.S. Army Corps of Engineers or other qualified agency or an individual documents the need for such change. However, prior to any such change, approval must be obtained from FEMA. An approved letter of map revision (LOMR) serves as record of this change.
Sec. 90-313. - Interpretation of district boundaries.#
Initial interpretations of the boundaries of the flood hazard overlay district shall be made by the administrator or designee. Should a dispute arise concerning the boundaries of any of the districts, the BZA shall make the necessary determination in accordance with article III, permits and applications, of this ordinance. The person questioning or contesting the location of the district boundary shall be given a reasonable opportunity to present their case to the BZA and to submit his own technical evidence if they so desire.
Sec. 90-314. - Submitting technical data.#
A community's base flood elevations may increase or decrease resulting from physical changes affecting flooding conditions. As soon as practicable, but not later than six months after the date such information becomes available, the city shall notify the Federal Insurance Administrator of the changes by submitting technical or scientific data. Such a submission is necessary so that upon confirmation of those physical changes affecting flooding conditions, risk premium rates, and floodplain management requirements will be based upon current data.
Sec. 90-315. - Letters of map revision.#
When development in the floodplain will cause or causes a change in the base flood elevation, the applicant, including state agencies, must notify FEMA by applying for a conditional letter of map revision (CLOMR) or a LOMR. Examples include:
(1) Any development that causes a rise in the base flood elevations within the floodway.
(2) Any development occurring in zone AE without a designated floodway, which will cause a rise of more than one foot in the base flood elevation.
(3) Alteration or relocation of a stream (including but not limited to installing culverts and bridges) 44 CFR 65.3 and 65.6(a)(12).
Sec. 90-316. - Establishment of flood hazard zones.#
(a) Basis of flood hazard zones.
(1) The various flood hazard zones shall include special flood hazard areas (SFHA). The basis for the delineation of these zones shall be the FIS and FIRM for the city and incorporated areas prepared by FEMA, Federal Insurance Administration, dated July 7, 2009, and any subsequent revisions or amendments thereto.
(2) The city may identify and regulate local flood hazard or ponding areas that are not delineated on the FIRM. These areas may be delineated on a "local flood hazard map" using best available topographic data and locally derived information such as flood of record, historic high-water marks, or approximated study methodologies.
(3) The boundaries of the SFHA and flood hazard zones are established as shown on the FIRM, which is declared to be a part of this division and shall be kept on file at the city planning and zoning department.
(b) Description of flood hazard zones. The flood hazard zones described below shall constitute the flood hazard overlay district. It shall be an overlay to the existing underlying zoning districts as shown on the official zoning ordinance map, and as such, the provisions for the flood hazard overlay district shall serve as a supplement to the underlying district provisions.
(1) Floodway areas. Those areas in an AE zone(s) and delineated, for purposes of this division, using the criterion that certain areas within the floodplain must be capable of carrying the water of the one percent annual chance flood without increasing the water surface elevation of that flood more than one foot at any point. These areas included in this flood hazard overlay district are specifically defined in table 2 of the city FIS and shown on the accompanying FIRM.
(2) AE Zone. A flood hazard zone with two categories:
a. Category 1 areas shall be those areas for which one percent annual chance flood elevations have been provided and the floodway has been delineated.
b. Category 2 areas on the FIRM accompanying the FIS shall be those areas for which one percent annual chance flood elevations have been provided and the floodway has not been delineated.
(3) A Zone. Those areas for which no detailed flood profiles or elevations are provided, but the one percent annual chance floodplain boundary has been approximated.
(4) X Zone. Other flood districts shall be those areas identified as zone X on the FIRM. This zone includes areas of two-tenths percent annual chance flood or areas of one percent annual chance flood with average depths of less than one foot or with drainage areas less than one square mile.
Sec. 90-317. - Permitted uses in flood hazard zones.#
In the flood hazard overlay district, the following uses and activities are permitted, provided that they are in compliance with the provisions of the underlying district and are not prohibited by any other ordinance:
Table 5.2 Permitted Uses in Flood Hazard Zones
| Use | AE | A | X |
|---|---|---|---|
| Uses consisting of development of a structure, where the effect of such development on flood heights is fully offset by accompanying improvements which have been approved by all appropriate local and/or state authorities, as required in this division. | P | ||
| Accessory structures consisting of 200 sq. ft. or less. | P | P | P |
| Agricultural uses, such as general farming, pasture, grazing, outdoor-plant nurseries, horticulture, truck farming, forestry, sod farming and wild crop harvesting. | P | P | P |
| Public and private recreational uses and activities, such as parks, day camps, picnic grounds, golf courses, boat launching and swimming area, horseback riding and hiking trails, wildlife and nature preserves and hunting and fishing areas. | P | P | P |
| Accessory residential uses, such as yard areas, gardens, play areas, and parking areas. | P | P | P |
| Accessory industrial and commercial uses, such as yard areas, previous parking and loading areas, etc. | P | P | P |
P = Permitted Blank = Not Permitted
Sec. 90-318. - Development in flood hazard zones.#
(a) Development in floodway areas.
(1) Within any designated floodway areas, no encroachments, including fill, new construction, substantial improvements, or other development shall be permitted unless it has been demonstrated through hydrologic and hydraulic analysis performed in accordance with standard engineering practice that the proposed encroachment will not result in any increase in flood levels within the community during the occurrence of the base flood discharge.
a. Hydrologic and hydraulic analyses shall be undertaken only by professional engineers or others of demonstrated qualifications, who shall certify that the technical methods used correctly reflect currently accepted technical concepts. Studies, analyses, computations, etc., shall be submitted in sufficient detail to allow a thorough review by the administrator.
b. If subsection (1) above is satisfied, all new construction and substantial improvements shall comply with all applicable flood hazard reduction provisions of sections 9-320 and 90-321.
(2) Development activities which increase the water surface elevation of the base flood may be allowed, provided that the applicant first applies—with the city's endorsement—for a conditional letter of map revision (CLOMR) and receives the approval of FEMA.
(b) Development in AE zones.
(1) Until a regulatory floodway is designated, no new construction, substantial improvements, or other development (including fill) shall be permitted within AE zones, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the city.
(2) Development activities which increase the water surface elevation of the base flood by more than one foot may be allowed, provided that the applicant first applies—with the city's endorsement—for a conditional letter of map revision (CLOMR) and receives the approval of FEMA.
(c) Development in A zones.
(1) Until a regulatory floodway is designated, no new construction, substantial improvements, or other development (including fill) shall be permitted within A zones, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the city.
(2) Development activities which increase the water surface elevation of the base flood by more than one foot may be allowed, provided that the applicant first applies—with the city's endorsement—for a conditional letter of map revision (CLOMR) and receives the approval of FEMA.
(3) For these areas, the base flood elevations and floodway information from federal, state, and other acceptable sources shall be used, when available (44 CFR 60.3(b)).
(4) Where the specific one percent annual chance flood elevation cannot be determined for this area using other sources of data, such as the U.S. Army Corps of Engineers Floodplain Information Reports, U.S. Geological Survey Flood-Prone Quadrangles, etc., then the applicant for the proposed use, development and/or activity shall determine this base flood elevation, in the following manner:
a. The elevation shall be determined by using the elevation of a point on the boundary of the identified floodplain area which is nearest the construction site.
b. Studies, analyses, computations, etc., shall be submitted in sufficient detail to allow a thorough review by the administrator.
c. The administrator reserves the right to require a hydrologic and hydraulic analysis for any development in this zone.
d. When such base flood elevation data is utilized, the lowest floor shall be 24 inches above the base flood elevation.
Sec. 90-319. - Permits and applications.#
(a) Permit requirement.
(1) All uses, activities and, development occurring within the flood hazard overlay district shall be undertaken only upon the issuance of a permit.§
a. Prior to the issuance of any such permit, the administrator shall require all applications to include compliance with all applicable state and federal laws and shall review all sites to assure they are reasonably safe from flooding.
b. Such development shall be undertaken only in strict compliance with the provisions of this division and with all other applicable codes and ordinances, as amended, such as the VA USBC and this ordinance.
(2) Under no circumstances shall any use, activity and/or development adversely affect the capacity of the channels or floodways or any watercourse, drainage ditch or any other drainage facility or system.
a. Prior to any proposed alteration or relocation of any channels or of any watercourse, stream, etc., within the city, a permit shall be obtained from the U.S. Army Corps of Engineers, the Virginia Marine Resources Commission, and the Virginia State Water Control Board.
b. Further notification of the proposal shall be given to all adjacent jurisdictions, the Division of Dam Safety and Flood Plain Management at the Department of Conservation and Recreation and the Federal Emergency Management Agency.
(b) Site plans and permit applications.
(1) All applications for development in the flood hazard overlay district and all building permits issued for the flood hazard overlay district shall incorporate the following information:
a. The elevation of the base flood at the site;
b. For structures to be elevated, the elevation of the lowest floor, including basement.
c. For structures to be floodproofed (non-residential only), the elevation to which the structure will be floodproofed.
d. Topographic information showing existing and proposed ground elevations.
(c) Standards for subdivision proposals. All subdivision proposals shall:
(1) Any subdivision proposal or other proposed development (including proposals for manufactured home parks and subdivisions) that exceed 50 lots or five acres, whichever is less, in an area where BFE data is not available, or the SFHA has not been delineated, shall include data using detailed methodologies, including a hydraulic and hydrologic analysis, comparable to those contained in a FIS. Once identified, those areas shall be subject to the requirements of this division.
(2) Have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage; and
(3) Have adequate drainage provided to reduce exposure to flood hazards.
Sec. 90-320. - Elevation and construction standards.#
In all identified flood hazard areas where base flood elevations have been provided in the FIS or generated by a certified professional in accordance with section 90-316 above, the following provisions shall apply:
(1) General standards.#
The following shall apply to all permits:
a.#
New construction and substantial improvements shall be built according to this ordinance and the VA USBC, and anchored to prevent flotation, collapse, or lateral movement of the structure.
b.#
Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for anchoring to resist wind forces.
c.#
New construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage.
d.#
New construction or substantial improvements shall be constructed by methods and practices that minimize flood damage.
e.#
The flood carrying capacity within an altered or relocated portion of any watercourse shall be maintained.
f.#
New construction and replacement of any utilities and facilities shall follow the provisions of section 90-321 of this article.
(2) Residential construction.#
New construction or substantial improvement of any residential structure (including manufactured homes) in zones AE and A, shall have the lowest floor, including basement, elevated to or above the base flood level plus 24 inches.
(3) Nonresidential construction.#
a.#
New construction or substantial improvement of any commercial, industrial, or nonresidential building shall have the lowest floor, including basement, elevated to or above the base flood level plus 24 inches.
b.#
Non-residential buildings located in all A and AE zones may be floodproofed in lieu of being elevated provided that all areas of the building components below the elevation corresponding to the base flood elevation plus two feet are watertight with walls substantially impermeable to the passage of water and use structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the standards of this subsection are satisfied. Such certification, including the specific elevation to which such structures are floodproofed, shall be maintained by the administrator.
(4) Space below the lowest floor.#
a.#
In zones A and AE, fully enclosed areas of new construction or substantially improved structures, which are below the regulatory flood protection elevation shall:
1.#
Not be designed or used for human habitation, but shall be used solely for parking of vehicles, building access, or limited storage of maintenance equipment used in connection with the premises. Access to the enclosed area shall be the minimum necessary to allow for parking of vehicles (garage door) or limited storage of maintenance equipment (standard exterior door), or entry to the living area (stairway or elevator);
2.#
Be constructed entirely of flood resistant materials below the regulatory flood protection elevation; and
3.#
Include measures to automatically equalize hydrostatic flood forces on walls by allowing for the entry and exit of floodwaters. To meet this requirement, the openings must either be certified by a professional engineer or architect or meet the following minimum design criteria:
(i)#
Provide a minimum of two openings on different sides of each enclosed area subject to flooding.
(ii)#
The total net area of all openings must be at least one square inch for each square foot of enclosed area subject to flooding.
(iii)#
If a building has more than one enclosed area, each area must have openings to allow floodwaters to automatically enter and exit.
(iv)#
The bottom of all required openings shall be no higher than one foot above the adjacent grade.
(v)#
Openings may be equipped with screens, louvers, or other opening coverings or devices, provided they permit the automatic flow of floodwaters in both directions.
(vi)#
Foundation enclosures made of flexible skirting are not considered enclosures for regulatory purposes, and, therefore, do not require openings. Masonry or wood underpinning, regardless of structural status, is considered an enclosure and requires openings as outlined above.
(5) Accessory structures.#
Accessory structures in the SFHA shall comply with the elevation requirements and other requirements of this section or, if not elevated or dry floodproofed, shall:
a.#
Not be used for human habitation;
b.#
Be limited to no more than 200 square feet in total floor area;
c.#
Be useable only for parking of vehicles or limited storage;
d.#
Be constructed with flood damage-resistant materials below the base flood elevation;
e.#
Be constructed and placed to offer the minimum resistance to the flow of floodwater;
f.#
Be anchored to prevent floatation;
g.#
Have electrical service and mechanical equipment elevated to or above the base flood elevation; and
h.#
Shall be provided with flood openings which shall meet the following criteria:
1.#
There shall be a minimum of two flood openings on different sides of each enclosed area; if a building has more than one enclosure below the lowest floor, each such enclosure shall have flood openings on exterior walls.
2.#
The total net area of all flood openings shall be at least one square inch for each square foot of enclosed area (non-engineered flood openings), or the flood openings shall be engineered flood openings that are designed and certified by a licensed professional engineer to automatically allow entry and exit of floodwaters; the certification requirement may be satisfied by an individual certification, or an evaluation report issued by the ICC Evaluation Service, Inc.
3.#
The bottom of each flood opening shall be one foot or less above the higher of the interior floor or grade, or the exterior grade, immediately below the opening.
4.#
Any louvers, screens, or other covers for the flood openings shall allow the automatic flow of floodwaters into and out of the enclosed area.
i.#
A signed declaration of land restriction (non-conversion agreement) shall be recorded on the property deed.
(6) Recreation vehicles.#
All recreational vehicles placed on sites must either:
a.#
Be on the site for fewer than 180 consecutive days and be fully licensed and ready for highway use (a recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick disconnect type utilities and security devices and has no permanently attached additions); or
b.#
Meet all the requirements of subsection (1) above.
Sec. 90-321. - Design criteria for utilities and facilities.#
(a) Sanitary sewer facilities.#
All new or replacement sanitary sewer facilities and private package sewage treatment plants, including all pumping stations and collector systems, shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into the flood waters. In addition, they should be located and constructed to minimize or eliminate flood damage and impairment.
(b) Water facilities.#
All new or replacement water facilities shall be designed to minimize or eliminate infiltration of flood waters into the system and be located and constructed to minimize or eliminate flood damages.
(c) Drainage facilities.#
All storm drainage facilities shall be designed to convey the flow of surface waters without damage to persons or property. The systems shall ensure drainage away from buildings and on-site waste disposal systems. The city council may require a primarily underground system to accommodate frequent floods and a secondary surface system to accommodate larger, less frequent floods. Drainage plans shall be consistent with local and regional drainage plans. The facilities shall be designed to prevent the discharge of excess runoff onto adjacent properties.
(d) Utilities.#
All utilities, such as gas lines, electrical and telephone systems being placed in flood-prone areas should be located, elevated where possible, and constructed to minimize the chance of impairment during a flooding occurrence. Electrical, heating, ventilation, plumbing, air conditioning equipment, and other service facilities, including duct work, shall be designed and placed to prevent water from entering or accumulating within the components during conditions of flooding.
(e) Streets and sidewalks.#
Streets and sidewalks should be designed to minimize their potential for increasing and aggravating the levels of flood flow. Drainage openings shall be required to sufficiently discharge flood flows without unduly increasing flood heights.
Sec. 90-322. - Existing structures in floodplain areas.#
Any structure or use of a structure or premises must be brought into conformity with these provisions when it is changed, repaired, or improved unless one of the following exceptions is established before the change is made:
(1)#
The administrator has determined that:
a.#
Change is not a substantial repair or substantial improvement;
b.#
No new square footage is being built in the floodplain that is not complaint;
c.#
No new square footage is being built in the floodway;
d.#
The change complies with this ordinance and the VA USBC; and
e.#
The change, when added to all the changes made during a rolling five-year period does not constitute 50 percent of the structure's value.
(2)#
The changes are required to comply with a citation for a health or safety violation.
(3)#
The structure is a historic structure and the change required would impair the historic nature of the structure.
Sec. 90-323. - Variances.#
(a) General.#
(1)#
A request for a variance to the requirements of this flood hazard overlay district may be made in accordance with article III, permits and applications, of this ordinance.
(2)#
The board of zoning appeals may refer any application and accompanying documentation pertaining to any request for a variance to any engineer or other qualified person or agency for technical assistance in evaluating the proposed project in relation to flood heights and velocities, and the adequacy of the plans for flood protection and other related matters.
(b) Limitations.#
(1)#
While the granting of variances generally is limited to a lot size less than one-half acre, deviations from that limitation may occur. However, as the lot size increases beyond one-half acre, the technical justification required for issuing a variance increases.
(2)#
No variance shall be granted for an accessory structure exceeding 200 square feet.
(c) Basis for variances.#
Variances shall be issued only:
(1)#
Upon a showing of good and sufficient cause;
(2)#
After the board of zoning appeals has determined that failure to grant the variance would result in exceptional hardship to the applicant, and
(3)#
After the board of zoning appeals has determined that the granting of such variance will not result in a(n):
a.#
Unacceptable or prohibited increase(es) in flood heights;
b.#
Additional threats to public safety;
c.#
Extraordinary public expense;
d.#
Creation of nuisances;
e.#
Cause for fraud or victimization of the public; and/or
f.#
A conflict with local laws or ordinances.
(d) Additional factors.#
In passing upon applications for variances, the board of zoning appeals shall satisfy all relevant factors and procedures specified in article III, permits and applications, of this ordinance, and consider the following additional factors:
(1)#
The danger to life and property due to increased flood heights or velocities caused by encroachments. No variance shall be granted for any proposed use, development, or activity within any floodway district that will cause any increase in the one percent chance flood elevation;
(2)#
The danger that materials may be swept on to other lands or downstream to the injury of others;
(3)#
The proposed water supply and sanitation systems and the ability of these systems to prevent disease, contamination, and unsanitary conditions;
(4)#
The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owners;
(5)#
The importance of the services provided by the proposed facility to the community;
(6)#
The requirements of the facility for a waterfront location;
(7)#
The availability of alternative locations not subject to flooding for the proposed use;
(8)#
The compatibility of the proposed use with existing development and development anticipated in the foreseeable future;
(9)#
The relationship of the proposed use to the comprehensive plan and this division;
(10)#
The safety of access by ordinary and emergency vehicles to the property in time of flood;
(11)#
The expected heights, velocity, duration, rate of rise, and sediment transport of the flood waters expected at the site; and
(12)#
The historic nature of a structure.
a.#
Variances for repair or rehabilitation of historic structures may be granted upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum necessary to preserve the historic character and design of the structure; and
(13)#
Such other factors which are relevant to the purposes of this ordinance.
(e) Notification and record.#
(1)#
The BZA shall notify the applicant for a variance, in writing, that the issuance of a variance to construct a structure below the base flood elevation will:
a.#
Increase the risks of life and property; and
b.#
Will result in increased premium rates for flood insurance.
(2)#
A record shall be maintained of the above notification as well as all variance actions, including justification for the issuance of the variances. Any variances which are issued shall be noted in the annual or biennial report submitted to the Federal Emergency Management Agency (FEMA).