Municipality · Virginia

Waynesboro

This locality is on the roster but its ordinance has not been retrieved yet.
5
Districts
223
Extracted rules
696
Standards
10
Chapters read
Zoning snapshotNot yet acquired

Zoning districts

5 districts, grouped by category.

General provisions

218 rules that bind every district rather than one — sign regulations, parking, floodplain and the rest of the code’s citywide chapters.

Sec. 98-7.14.12.C1 standards

No variance shall be granted for any proposed use, development, or activity within the -FO district that will cause any increase in the 100-year flood elevation.

Sec. 98-7.14.9.A1 standards

While the granting of variances generally is limited to a lot size less than one-half acre, deviations from that limitation may occur.

Sec. 98-7.4.101 standards

An owner may proffer reasonable conditions including cash, real property, services, land use restrictions and other conditions, in addition to the regulations established elsewhere in this Chapter, as part of an application requesting an amendment to the zoning district regulations...

Sec. 98-7.6.101 standards

No Conditional Use Permit shall be approved by the City Council, unless the following findings are made concerning the application: A. That the proposed use is included specifically as one of the permitted conditional uses in the district...

Sec. 98-7.7.11 standards

All nonresidential and multiple-family development (multiplexes, townhouses and multifamily buildings) shall be subject to the site plan review requirements of this section.

Sec. 98-7.7.111 standards

Zoning Administrator's final decision on a major site plan may be appealed within 30 days of the decision in accordance with Sec. 98-7.15, Administrative appeal.

Sec. 98-7.7.71 standards

An approved final site plan shall be valid for a period of five years from the date of approval thereof or for such longer period as the Zoning Administrator may, at the time of approval, determine to be reasonable...

Sec. 98-7.7.71 standards

An approved final site plan shall be valid for a period of five years from the date of approval thereof or for such longer period as the Zoning Administrator may, at the time of approval, determine to be reasonable...

Sec. 98-7.7.8.B.11 standards

Land disturbing activities, other than timbering, that affect more than 10,000 square feet are also subject to the approval of an erosion and sediment control plan by the City of Waynesboro Engineering Division...

Sec. 98-7.7.8.B.11 standards

Land disturbing activities, other than timbering, that affect more than 10,000 square feet are also subject to the approval of an erosion and sediment control plan by the City of Waynesboro Engineering Division...

Sec. 98-7.7.8.B.21 standards

New development or redevelopment projects, other than timbering, that affect more than 10,000 square feet are also subject to the requirements of City Code Chapter 30, Article III, Stormwater Management.

Sec. 98-7.7.8.B.21 standards

New development or redevelopment projects, other than timbering, that affect more than 10,000 square feet are also subject to the requirements of City Code Chapter 30, Article III, Stormwater Management.

Sec. 98-7.7.8.C.11 standards

Provision shall be made and facilities constructed for all available utilities, i.e., water, sewer, gas, telephone and electric services, to be constructed underground in accordance with City standards and requirements.

Sec. 98-7.7.8.C.11 standards

Provision shall be made and facilities constructed for all available utilities, i.e., water, sewer, gas, telephone and electric services, to be constructed underground in accordance with City standards and requirements.

Sec. 98-7.8.11 standards

Temporary uses occurring on property outside of the public right-of-way, including those operating for less than 30 days within a one-year time period, shall obtain a temporary use permit from the Zoning Administrator...

Sec. 98-7.8.11 standards

Temporary uses occurring on property outside of the public right-of-way, including those operating for less than 30 days within a one-year time period, shall obtain a temporary use permit from the Zoning Administrator...

Sec. 98-7.9.11 standards

It shall be unlawful to move, construct, or alter, or to commence moving, constructing, altering, except for making ordinary repairs, any building or other structure on a site, including an accessory structure, until the Zoning Administrator has issued a zoning permit.

Sec. 98-8.2.53 standards

Existing structures in the floodway area shall not be expanded or enlarged unless it has been demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practices that the proposed expansion would not result in any increase in the base flood elevation.

Source documents

The chapters of the adopted code that were retrieved, read and extracted from. Everything above traces back to one of these.