Dendron, Virginia · District

M-1

Light Industrial District

Dimensional standards

Uses

Conditional / special use1

Extracted standards

6 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Fencing & walls

Lighting

  • Motion-sensor lighting

    Lighting of any battery energy storage system shall be limited to that minimally required for safety and operational purposes and all lighting shall be exclusively motion-sensor activated. All lighting must be in compliance with the International Dark-Sky Association's (IDA) guidelines...

Noise

  • Maximum noise at property line65 dBA

    The average noise generated from the battery energy storage systems, components, and associated ancillary equipment at any time shall not exceed a noise level of 65 dBA as measured from the property line of an adjoining parcel...

Other

  • Decommissioning timeline6 months

    The decommission process shall occur within six months after the battery energy storage system permanently ceases operation.

  • Be located a minimum of at least 75 feet from all property lines and otherwise comply with all minimum height, bulk, setback, and yard requirements of the underlying district.

Signage

From the ordinance

In the M-1 and M-2 District: Be located a minimum of at least 75 feet from all property lines and otherwise comply with all minimum height, bulk, setback, and yard requirements of the underlying district.
Sec. 4-609