Municipality · Colorado

Berthoud

The ordinance has been retrieved, read and turned into structured rules.
33
Districts
47
Extracted rules
355
Standards
16
Chapters read

Zoning districts

33 districts, grouped by category.

General provisions

14 rules that bind every district rather than one — sign regulations, parking, floodplain and the rest of the code’s citywide chapters.

30-3-103.A

T — Transitional District

30-3-1057 standards

Permanent features allowed within setbacks shall include: Cornices, canopies, eaves or other similar architectural features if they extend no more than two feet into a required setback; Steps or ramps to the principal entrance and necessary landings, provided they do not extend more than six feet into the required setback; ...

30-3-1072 standards

Whenever a nonconforming use or building has been discontinued for a period of six months, such use shall not thereafter be reestablished.

30-3-1093 standards

The Planning Commission may authorize waivers in regards to platting, zoning and design standards for multiple lots from the Development Code of the Town of Berthoud with respect to the requirements of the following chapters only: Chapter 30-2, Design Standards, Chapter 30-3, Zoning, or Chapter 30-7, Signs.

30-3-1144 standards

It shall be unlawful to operate a retail marijuana cultivation facility or a retail marijuana products manufacturing business that is not co-located on the same parcel of land as a retail marijuana store.

Sec. 30-3-1061 standards

Unless otherwise stated in the Resolution, all Use by Special Review applications shall be commenced within six months of the time of such approval, otherwise the Use by Special Review shall be null and void.

Sec. 30-3-1084 standards

The Community Development Director is authorized to approve administrative variances from setback requirements up to ten percent of the required setback

Sec. 30-3-11610 standards

The 1st Street Corridor Overlay District focuses on directing the general character of new development and redevelopment within the 1st Street corridor, in accordance with the 1st Street Corridor Plan adopted by Resolution 2023-09.

Section 3.20, Table 3.7 and Notes13 standards

Building Height: Maximum: 2 Stories (35 feet). Front setback on Mountain Ave: 80 ft min. Secondary street: 20 ft min.

Section 3.8, Mountain Avenue Overlay District5 standards

The boundary ... shall be the area so labeled ... which generally extends along HWY 56 and is applicable to all properties within 150 feet of the centerline of Hwy 56, Larimer County Road 8, and Weld County Road 44 within Town Limits.

Section 30-3-11179 standards

Towers shall be subject to the maximum height restrictions of the zoning district in which they are located, subject to a maximum height limit of 60 feet.

Section 30-3-1129 standards

Home occupations must meet the following standards: ... not more than one outside employee ... shall not exceed 1,000 square feet or 30 percent of the total floor area ... advertising signs larger than two square feet ... maximum number of vehicle trips per day for clients ... is 15.

Section 30-3-11328 standards

The maximum number of short-term rentals in the Town shall not exceed 50.

Table 3.1 Footnotes, Section 30-3-1046 standards

All unattached accessory buildings shall be five feet from all property lines and no more than 30' in height; ADUs no more than 850 sq ft; rear setback 5' min for new lots; buffer 30' from arterial, 20' from collector.

Source documents

The chapters of the adopted code that were retrieved, read and extracted from. Everything above traces back to one of these.