Municipality · California

Paradise

The ordinance has been retrieved, read and turned into structured rules.
7
Districts
114
Extracted rules
444
Standards
32
Chapters read

Zoning districts

7 districts, grouped by category.

General provisions

107 rules that bind every district rather than one — sign regulations, parking, floodplain and the rest of the code’s citywide chapters.

17.40.500(C)11 standards

A large collection facility is permitted in either the C-C or I-S zone with a site plan review...

17.40.500(D)11 standards

A light processing facility may be permitted in the community-commercial zone with a conditional use permit and in the industrial-services zone with a site plan review.

17.40.500(D)10 standards

Heavy processing may be allowed in the industrial-services zone with a conditional use permit.

17.42.0252 standards

The following wireless communication facilities shall be exempt from the requirements of this chapter provided its antenna structure complies with all other applicable zoning requirements of this title: A. Any antenna structure that is designed and used solely to receive UHF, VHF, AM and FM broadcast signals from licensed radio and television stations; B. Any antenna structure that is designed and used solely in connection with authorized operations of an amateur radio station licensed by the FCC.

17.42.0301 standards

Every wireless communication facility permitted and constructed within the town shall comply with all safety standards of the American National Standards Institute, Institute of Electrical and Electronic Engineers, Public Utilities Commission, Federal Communications Commission, Uniform Building Code, National Electric Code, this code and any other codes and standards as applicable.

17.42.0403 standards

All wireless communication facilities shall be subject to the following permitting: A. Administrative Permit. New wireless communication facilities which will be co-locating on or within an existing approved tower or facility shall be subject to town approval of an administrative permit.

17.42.0501 standards

Building mounted facilities shall not exceed fifteen (15) feet in height greater than the maximum height permitted for the zoning district in which it is located.

17.42.0606 standards

No facility shall be installed closer than one-half (½) mile from another site unless it is on a previously approved co-located facility or multiple-user site.

17.42.0702 standards

Only those facilities that are building mounted or totally enclosed within a building shall be permitted in any town residential zoning district.

17.42.0805 standards

All wireless communication facilities equipment shall be screened or camouflaged so as to reduce visual impacts. Existing site features shall be used to screen the facility where possible.

17.42.0902 standards

The service provider of a wireless communication facility shall notify the town of the intent to discontinue operation no less than thirty (30) days before discontinuance. Upon the discontinuance of use, all related equipment shall be removed and the property restored to the pre-construction condition within one hundred twenty (120) days of the cessation of operation.

17.44.0203 standards

the developer shall be eligible for a housing density bonus or incentives if the housing development consists of five (5) or more units.

17.45.1100 and 17.45.14004 standards

All zoning violations shall be abated within thirty days of the mailing of the notice of violation ... Any person violating any of the provisions of this title shall be guilty of an infraction ... Any additional violation of this title within one year of the first violation shall be prosecuted by the town attorney as a misdemeanor with a fine not to exceed one thousand dollars ($1,000.00) and/or six (6) months in the county jail.

17.45.5102 standards

Notices of public hearings on applications for use permits, appeals and amendments to this title changing the boundaries of any district or text of this title shall be given by the body conducting such hearings at least ten days prior thereto, by publication in a newspaper of general circulation in the town. In addition, the town shall give additional notice by mail, using addresses from the latest equalized assessment roll, to all owners of property within a three-hundred-foot distance of any boundary of the subject property.

17.45.5501 standards

The town may prezone unincorporated territory adjoining the town for the purpose of determining the zoning that will apply to such property in the event of subsequent annexation to the town.

17.45.5601 standards

When an application for zoning amendment, a use permit, site plan review, or variance is denied, the application shall not be eligible for reconsideration for one year subsequent to such denial unless a new application affecting or including all or part of the same property is substantially different, in the opinion of the planning director, from the application that was denied.

17.45.800 and 17.45.9002 standards

All appeals of planning director or planning commission decisions shall be administered as per the following applicable provisions: ... within seven days after the final decision action ... within five (5) days after the final decision action.

Chapter 17, Section 17.17 (17.17.100-17.17.500)3 standards

Maximum potential residential densities shall not exceed ten (10) dwelling units per acre.

Chapter 17.296 standards

A planned development combining zone shall include a minimum of two (2) acres, under single ownership or otherwise subject to unified planning, construction and management.

Chapter 17.32 (17.32.100-17.32.600)10 standards

The following temporary land uses shall be allowed subject to the regulations set forth within this chapter.

Source documents

The chapters of the adopted code that were retrieved, read and extracted from. Everything above traces back to one of these.