cubic yards of material, shall include a haul route, subject to Section 22.140.240 ( Grading Projects ). **ii.** Any grading occurring during the rainy season, defined as October 15 of any year through April 15 of the subsequent
Read it in the chapter →Grading projects
How this ordinance defines it
The operative definition is the local one. Codes routinely subdivide a category into tiers — “day care 2, family”, “group home 2” — and attach different permissions to each, so only Los Angeles County Unincorporated’s own text settles what this covers.
Use Category that includes all office uses other than Studio Office. **Off-Site Transport Grading Project .** The movement of over 10,000 cubic yards of dirt, soil, sand, gravel, rock, clay, decomposed granite, or other minerals related to
Read it in the chapter →excavation or otherwise for any purpose other than surface mining operations, or a grading project with off-site transport. **Breezeway.** A breezeway is a vehicle pass-through connected to a residential structure, often connecting two sections of livable
Read it in the chapter →|-----|-----|-----|-----|-----| | - | - | - | - | SPR | ### Grading projects #### More than 10,000 up to 100,000 cubic yards of material to be transported off-site | A-1 | A-2 | O-S
Read it in the chapter →part of the building project, or on property adjoining the construction site; - Grading projects , off-site transport, where not more than 100,000 cubic yards of material are to be transported, subject to the conditions and limitations
Read it in the chapter →