Paso Robles, California · General provision

21.58.060(H)

Dimensional standards

lot requirementsSTREETbuildable areaFront 15 ftRear 4 ftSide 4 ftMAX HEIGHT16 ftMAX LOT COVERAGE50%
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Extracted standards

29 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Design

Height

Landscaping & trees

Lighting

  • Outdoor lighting must be shielded

    Outdoor lighting shall be shielded so that the light source is not visible from off-site. Shielding shall be at least two inches in dimension measured from the lens or light source to direct light toward buildings or the ground and reduce glare.

Other

From the ordinance

One off-street parking space on a paved surface served by a paved driveway is required for each ADU. The parking space may be provided in setback areas or as tandem parking...
21.58.060(H)

Parking requirements

{
  "ADU": "1 space per ADU, may be in setback or tandem, unless exceptions apply"
}