4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- On-site notice required
Notice of the project application shall be required for: i. Projects consisting of two—ten residential units; and ii. Projects requesting site plan modifications pursuant to Section 21.17.020 (Site Plan Modifications).
- On-site notice setbackSetbackThe distance a building must be held back from a lot line.10 ft
The posting shall be placed in the ground or on a fence, wall, or building façade that is set back no more than ten feet from the street property line.
- On-site notice size11 inches
A minimum of one notice, at least eleven inches by seventeen inches in size, shall be posted along each street frontage.
- On-site notice timing48 hours
The on-site notice shall be posted on the subject site at least forty-eight hours prior to the meeting.
From the ordinance
Notice of the project application shall be required for: i. Projects consisting of two—ten residential units; and ii. Projects requesting site plan modifications pursuant to Section 21.17.020 (Site Plan Modifications).