Dimensional standards
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum pavement in front setbackSetbackThe distance a building must be held back from a lot line.40 pct
pavement in the front setback shall be limited to forty percent of the required front setback.
From the ordinance
In the PM zoning district, pavement in the front setback shall be limited to forty percent of the required front setback.