Paso Robles, California · General provision

21.54.020

Extracted standards

2 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Utility housings screening required

    Transformers, control points, and other utility housings shall be located so as to minimize their visual impact and shall be screened in a manner approved by the review authority.

  • New utility service lines underground required

    All new utility service lines shall be under-grounded unless determined to be infeasible or unduly cost prohibitive as determined by the city engineer.

From the ordinance

All new utility service lines shall be under-grounded unless determined to be infeasible or unduly cost prohibitive as determined by the city engineer. Transformers, control points, and other utility housings shall be located so as to minimize their visual impact and shall be screened in a manner approved by the review authority.
21.54.020