Dimensional standards
Servicing
- Geographic extent
- All zones
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
For a building site exceeding twenty-five (25) percent average slope the front yard setback from a town-maintained street shall be the right-of-way line, plus two (2) feet, unless the town engineer requires a greater setback distance.
From the ordinance
For a building site exceeding twenty-five (25) percent average slope the front yard setback from a town-maintained street shall be the right-of-way line, plus two (2) feet, unless the town engineer requires a greater setback distance.