Orange County Unincorporated, California · General provision
Sec. 7-9-66
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- GradingGrading (cut & fill)Reshaping land by removing earth (cut) or adding it (fill), often capped by volume. permit threshold10,000 cubic yardscubic yard (cy)A unit of earth volume used in grading limits — roughly one dump-truck scoop.
A Site Development Permit issued pursuant to section 7-9-125 shall be required if any grading operation involves: (1) More than ten thousand (10,000) cubic yards on a building site
- GradingGrading (cut & fill)Reshaping land by removing earth (cut) or adding it (fill), often capped by volume. permit threshold on steep slopeSteep slopeGround above a stated gradient, where building is restricted or barred.500 cubic yardscubic yard (cy)A unit of earth volume used in grading limits — roughly one dump-truck scoop.
or (2) More than five hundred (500) cubic yards on a slope greater than thirty percent (30%).
From the ordinance
A Site Development Permit issued pursuant to section 7-9-125 shall be required if any grading operation involves: (1) More than ten thousand (10,000) cubic yards on a building site; or (2) More than five hundred (500) cubic yards on a slope greater than thirty percent (30%).