Orange County Unincorporated, California · General provision

Sec. 7-9-30.2

Uses

Extracted standards

4 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • All other uses require Use Permit

    All other uses shall be prohibited unless a Use Permit by the Planning Commission is obtained.

  • Separation between recovery facilities1,000 ft

    There shall be one thousand (1,000) feet of separation (as measured from property lines) between any two (2) Alcoholism or Drug Abuse Recovery/Treatment facilities of seven (7) or over that require a UP, or between any two (2) Sober Living Homes, or between any Alcoholism or Drug Abuse Recovery/Treatment facility and Sober Living Home, as defined.

  • Any principal permitted use or structure, which requires a grading permit or building permit, shall also require a Site Development Permit.

  • Wireless facility permit requirement100 ft

    Site Development Permit for a wireless communications facility unless within one hundred (100) feet of a residential or open space zoning district as measured from the parcel line. Use Permit for a wireless communications facility if within one hundred (100) feet of a residential or open space zoning district, as measured from the parcel line.

From the ordinance

In the Agriculture and Open Space Districts, the following uses are prohibited: (a) Commercial Stockpiling or Processing of Manure. All other uses shall be prohibited unless a Use Permit by the Planning Commission is obtained.
Sec. 7-9-30.2