Orange County Unincorporated, California · General provision

Sec. 7-9-42.9

Dimensional standards

Extracted standards

9 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Floodplain

  • Base elevation data required for large subdivisions

    All subdivision proposals and other proposed developments greater than fifty (50) lots or five (5) acres shall require base elevation data.

  • Detailed drainage study required

    Applications shall include submittal of detailed drainage studies and plans indicating how site grading, in conjunction with any necessary drainage conveyance systems, shall provide structures that are safe from flood flows...

  • Elevation Certificate required

    The applications shall include a County of Orange 'Elevation Certificate' identifying the base flood elevation and certifying that the planned elevation of the lowest floor, including basements, is at least one (1) foot above the base flood elevation.

  • Federal and State permits required

    The application shall include evidence that all necessary permits as required by Federal and State law, including Section 404 of the Federal Water Pollution Control Act Amendments of 1972, have been received.

  • Dry or wet floodproofing required

    Applicable dry or wet floodproofing have been applied to the project.

  • Maximum increase in water surface elevation1 ft

    This means that the cumulative effect of the proposed development when combined with all other existing and anticipated development shall not increase the water surface elevation of the base flood more than one (1) foot.

  • Letter of Map Revision required

    When base flood elevation changes occur due to physical alterations, the applicant shall submit technical or scientific data as part of their application to FEMA for a letter of map revision (LOMR).

  • Lowest floor elevation above base flood1 ft

    Electrical, heating, and plumbing equipment, including electrical panels, water heaters, and water filtration systems, is designed and located to prevent water from entering or accumulating within the components during conditions of flooding and elevated to at least one (1) foot above the base flood elevation.

  • Flood carrying capacity maintained

    The flood carrying capacity within any altered or relocated portion of a watercourse is maintained.

From the ordinance

A California-registered professional civil engineer or architect shall certify in the application the following... Electrical, heating, and plumbing equipment... elevated to at least one (1) foot above the base flood elevation.
Sec. 7-9-42.9